Difference between revisions of "DBA First iteration running phase"
Jump to navigation
Jump to search
Line 9: | Line 9: | ||
|'''DO''' | |'''DO''' | ||
|- | |- | ||
− | |''' | + | |'''November 2021''' |
|Real eProcedure with real data | |Real eProcedure with real data | ||
|RO | |RO | ||
|NL | |NL | ||
|- | |- | ||
− | | rowspan="2" |''' | + | | rowspan="2" |'''December 2021''' |
|Simulation with real data | |Simulation with real data | ||
|NL | |NL |
Revision as of 08:32, 8 October 2021
Introduction
This page addresses general information about the first iteration running phase for the Doing Business Abroad pilot.
Estimated start dates of pilot
type | DE | DO | |
November 2021 | Real eProcedure with real data | RO | NL |
December 2021 | Simulation with real data | NL | RO |
Simulation with real data1 | RO | AT | |
March 2022 | Real eProcedure with real data2 | AT | RO |
Real eProcedure with real data2 | AT | NL | |
Real eProcedure with real data2 | NL | AT | |
TBD2, 3 | Simulation with real data | SE | RO |
Simulation with fictitious data | RO | SE | |
Simulation with real data | SE | NL | |
Simulation with real data | SE | AT |
- Assuming that the RomanianDutch/Swedish eIDAS pilot node profile 1.1 can communicate with the AT eIDAS pilot node profile 1.2
- The AT eProcedure will be connected to the AT eIDAS pilot node in March 2022
- For Bolagsverket, an eIDAS pilot node solution needs to be established first