Difference between revisions of "DBA First iteration running phase"

From DE4A
Jump to navigation Jump to search
Line 13: Line 13:
 
|'''Data Owner'''
 
|'''Data Owner'''
 
|'''Companies'''
 
|'''Companies'''
 +
|'''Status'''
 
|-
 
|-
| rowspan="5" |'''January/February 2022'''
+
| rowspan="5" |'''February/march/April 2022'''
 
|Simulation with real data
 
|Simulation with real data
 
|RO
 
|RO
 
|NL
 
|NL
 
|Dutch (real)
 
|Dutch (real)
 +
|Testing complete
 
|-
 
|-
 
|Real eProcedure with real data
 
|Real eProcedure with real data
Line 24: Line 26:
 
|RO
 
|RO
 
|Romanian (real)
 
|Romanian (real)
 +
|Testing complete
 
|-
 
|-
 
|Simulation with real data
 
|Simulation with real data
Line 29: Line 32:
 
|RO
 
|RO
 
|Romanian (real)
 
|Romanian (real)
 +
|Testing complete
 
|-
 
|-
 
|Simulation with real data
 
|Simulation with real data
Line 34: Line 38:
 
|NL
 
|NL
 
|Dutch (real)
 
|Dutch (real)
 +
|Testing complete
 
|-
 
|-
 
|Simulation with real data
 
|Simulation with real data
Line 39: Line 44:
 
|AT
 
|AT
 
|Austrian (real)
 
|Austrian (real)
 +
|Testing complete
 
|-
 
|-
 
| rowspan="3" | '''March/April 2022'''
 
| rowspan="3" | '''March/April 2022'''
Line 45: Line 51:
 
|RO
 
|RO
 
|Romanian (real)
 
|Romanian (real)
 +
|Testing in progress
 
|-
 
|-
 
|Real eProcedure with real data<sup>2</sup>
 
|Real eProcedure with real data<sup>2</sup>
Line 50: Line 57:
 
|NL
 
|NL
 
|Dutch (real)
 
|Dutch (real)
 +
|Testing in progress
 
|-
 
|-
 
|Real eProcedure with real data<sup>2</sup>
 
|Real eProcedure with real data<sup>2</sup>
Line 55: Line 63:
 
|AT
 
|AT
 
|Austrian (real)
 
|Austrian (real)
 +
|Testing in progress
 
|-
 
|-
 
| rowspan="3" | '''TBD'''<sup>2, 3</sup>
 
| rowspan="3" | '''TBD'''<sup>2, 3</sup>
Line 61: Line 70:
 
|RO
 
|RO
 
|Romanian (real)
 
|Romanian (real)
 +
|
 
|-
 
|-
 
|Simulation with real data<sup>1</sup>
 
|Simulation with real data<sup>1</sup>
Line 66: Line 76:
 
|AT
 
|AT
 
|Austrian (real)
 
|Austrian (real)
 +
|
 
|-
 
|-
 
|Simulation with fictitious data
 
|Simulation with fictitious data
Line 71: Line 82:
 
|SE
 
|SE
 
|Swedish (fake)
 
|Swedish (fake)
 +
|
 
|}
 
|}
  

Revision as of 13:47, 16 February 2022

Back to Doing Business Abroad main page

[Work in progress]

Introduction

This page addresses general information about the first iteration running phase for the Doing Business Abroad pilot.

Estimated earliest start dates of pilot

type Data Evaluator Data Owner Companies Status
February/march/April 2022 Simulation with real data RO NL Dutch (real) Testing complete
Real eProcedure with real data NL RO Romanian (real) Testing complete
Simulation with real data SE RO Romanian (real) Testing complete
Simulation with real data SE NL Dutch (real) Testing complete
Simulation with real data SE AT Austrian (real) Testing complete
March/April 2022 Real eProcedure with real data2 AT RO Romanian (real) Testing in progress
Real eProcedure with real data2 AT NL Dutch (real) Testing in progress
Real eProcedure with real data2 NL AT Austrian (real) Testing in progress
TBD2, 3 Simulation with real data SE RO Romanian (real)
Simulation with real data1 RO AT Austrian (real)
Simulation with fictitious data RO SE Swedish (fake)
  1. Assuming that the RomanianDutch/Swedish eIDAS pilot node profile 1.1 can communicate with the AT eIDAS pilot node profile 1.2
  2. The AT eProcedure will be connected to the AT eIDAS pilot node in March 2022
  3. For Bolagsverket, an eIDAS pilot node solution needs to be established first

End date of the pilot running phase

The scheduled end date of the first iteration running phase is January 30th 2022.

For several DE/DO combinations in the table above, the estimated start date of the pilot is later than the official end date of the pilot running phase (1st iteration). For those combinations, exceptions will be made for the pilot period.