Difference between revisions of "DBA Implementation"
(187 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | + | [[Doing Business Abroad Pilot|Back to Doing Business Abroad main page]] | |
− | + | [Draft] | |
− | + | This page contains the process, planning and status of establishing connections between participating Member States is presented. | |
− | |||
− | |||
− | |||
− | |||
− | |||
=== Establishing connections === | === Establishing connections === | ||
Line 16: | Line 11: | ||
===== Process ===== | ===== Process ===== | ||
− | For establishing connections between DE4A | + | For establishing connections between DE4A Conectors of participating Member States the following steps are performed: |
− | + | # Preparation | |
− | + | #* collecting necessary information for configuration of the common components. | |
− | + | # Local testing | |
− | + | #* setting up the national DE4A Connector and connecting this to a DE4A Connector in the DE4A playground. | |
− | + | # Connectivity testing | |
− | + | #* testing a full chain of components, using a [[Mock|Mocked DE]], the national DE4A Connector (acting as a DT or DR), the playground DE4A Connector (acting as a DR or DT) and a [[Mock|Mocked DO]]. | |
− | + | # Connectathon | |
− | + | #* testing a full chain of components, using a [[Mock|Mocked DE]], one national DE4A Connector (acting as a DT or DR), another national DE4A Connector (acting as a DR or DT) and a [[Mock|Mocked DO]] (Milestone 2 and 3) | |
− | + | #* testing a full chain of components, using a real DE, one national DE4A Connector (acting as a DT or DR), another national DE4A Connector (acting as a DR or DT) and a real DO (Milestone 4) | |
During the OOP TS connectathons, these test cases and preparations are being used / executed. | During the OOP TS connectathons, these test cases and preparations are being used / executed. | ||
− | [[File: | + | ===== Versions of the connector ===== |
+ | The DE4A Connector used for piloting will be developed in 2 main versions: | ||
+ | |||
+ | * V1: DE4A Connector supporting the intermediation pattern for piloting UC1 | ||
+ | * V2: DE4A Connector supporting the intermediation pattern for UC1 the S&N and Lookup pattern for UC2 | ||
+ | |||
+ | Only the V1 connector will be used in the first iteration (as only UC1 will be piloted in the first iteration). For the final iteration, only the V2 connector will be used. [[File:20210824 Test cases DE4A cross-border AT-NL-RO-SE.xlsx|alt=Testscases and preparations|thumb|Testcases, procedures and preparation for connectathons]] | ||
+ | |||
+ | === Status of connections (iteration 1) === | ||
− | + | The current status of participating Member States having established connections is displayed in the tables below: | |
− | + | {| class="wikitable" style="width: 60%;" | |
− | {| class="wikitable" | ||
|+ | |+ | ||
− | < | + | <small><u>eIDAS Milestone 1: Connecting eIDAS proxies and connectors with Full Powers Validation</u></small> |
− | ! | + | ! |
− | ! colspan=" | + | ! colspan="5" |Proxy |
|- | |- | ||
+ | ! | ||
+ | ! | ||
+ | !style="width: 16%"|AT | ||
+ | !style="width: 16%"|NL | ||
+ | !style="width: 16%"|RO | ||
+ | !style="width: 16%"|SE | ||
+ | |- | ||
+ | ! rowspan="4" style="width: 16%"|Connector | ||
!AT | !AT | ||
+ | |style="background-color:grey"|N/A | ||
+ | |style="background-color:grey"|N/A | ||
+ | |style="background-color:grey"|N/A | ||
+ | |style="background-color:grey"|N/A | ||
+ | |- | ||
!NL | !NL | ||
+ | |style="background-color:grey"|N/A | ||
+ | |style="background-color:lightgrey"| | ||
+ | |style="background-color:lightgreen"| | ||
+ | |style="background-color:grey"|N/A | ||
+ | |- | ||
!RO | !RO | ||
+ | |style="background-color:lightgreen"| | ||
+ | |style="background-color:lightgreen"| | ||
+ | |style="background-color:lightgrey"| | ||
+ | |style="background-color:grey"|N/A | ||
+ | |- | ||
!SE | !SE | ||
+ | |style="background-color:grey"|N/A | ||
+ | |style="background-color:grey"|N/A | ||
+ | |style="background-color:grey"|N/A | ||
+ | |style="background-color:lightgrey"| | ||
+ | |} | ||
+ | {| class="wikitable" style="width: 60%;" | ||
+ | |+ | ||
+ | <small><u>OOP TS Milestone 2/3: Connecting DE4A Connectors between Member States</u></small> | ||
+ | ! | ||
+ | ! colspan="5" |DE4A Connector acting as DT | ||
|- | |- | ||
− | ! rowspan="4" | | + | ! |
− | !AT | + | ! |
− | | | + | !style="width: 16%"|AT |
− | | | + | !style="width: 16%"|NL |
− | | | + | !style="width: 16%"|RO |
− | | | + | !style="width: 16%"|SE |
+ | |- | ||
+ | ! rowspan="4" style="width: 16%"|DE4A Connector | ||
+ | |||
+ | acting | ||
+ | |||
+ | as DR | ||
+ | !AT | ||
+ | |style="background-color:lightgrey"| | ||
+ | |style="background-color:grey"|N/A | ||
+ | |style="background-color:grey"|N/A | ||
+ | |style="background-color:grey"|N/A | ||
|- | |- | ||
!NL | !NL | ||
− | | | + | |style="background-color:grey"|N/A |
− | | | + | |style="background-color:lightgrey"| |
− | | | + | |style="background-color:lightgreen"| |
− | + | |style="background-color:lightgreen"| | |
− | | | ||
|- | |- | ||
!RO | !RO | ||
− | | | + | |style="background-color:lightgreen"| |
− | | | + | |style="background-color:lightgreen"| |
− | + | |style="background-color:lightgrey"| | |
− | | | + | |style="background-color:lightgreen"| |
− | | | ||
|- | |- | ||
!SE | !SE | ||
− | | | + | |style="background-color:lightgreen"| |
− | | | + | |style="background-color:lightgreen"| |
− | | | + | |style="background-color:lightgreen"| |
− | | | + | |style="background-color:lightgrey"| |
|} | |} | ||
− | {| class="wikitable" | + | |
+ | {| class="wikitable" style="width: 60%;" | ||
|+ | |+ | ||
− | <small> | + | <small><u>OOP TS Milestone 4: Connecting DE4A Connectors, Data Evaluators and Data Owners between Member States</u></small> |
− | ! | + | ! |
− | ! colspan=" | + | ! colspan="5" |MS acting as DP |
|- | |- | ||
− | !AT | + | ! |
− | !NL | + | ! |
− | !RO | + | !style="width: 16%"|AT |
− | !SE | + | !style="width: 16%"|NL |
+ | !style="width: 16%"|RO | ||
+ | !style="width: 16%"|SE | ||
|- | |- | ||
− | ! rowspan="4" | | + | ! rowspan="4" style="width: 16%"|MS |
+ | acting | ||
+ | |||
+ | as DC | ||
!AT | !AT | ||
− | | | + | |style="background-color:lightgrey"| |
− | | | + | |style="background-color:grey"|N/A |
− | | | + | |style="background-color:grey"|N/A |
− | | | + | |style="background-color:grey"|N/A |
|- | |- | ||
!NL | !NL | ||
− | | | + | |style="background-color:grey"|N/A |
− | | | + | |style="background-color:lightgrey"| |
− | | | + | |style="background-color:lightgreen"| |
− | | | + | |style="background-color:grey"|N/A |
|- | |- | ||
!RO | !RO | ||
− | | | + | |style="background-color:lightgreen"| |
− | | | + | |style="background-color:lightgreen"| |
− | | | + | |style="background-color:lightgrey"| |
− | | | + | |style="background-color:grey"|N/A |
|- | |- | ||
!SE | !SE | ||
− | | | + | |style="background-color:grey"|N/A |
− | | | + | |style="background-color:lightgreen"| |
− | | | + | |style="background-color:lightgreen"| |
− | | | + | |style="background-color:lightgrey"| |
|} | |} | ||
+ | <small>Green = Connection established</small> | ||
− | ==== | + | <small>Yellow = Connection partlially established (issues remaining to be solved)</small> |
− | + | ||
− | {| class="wikitable" | + | <small>Red = Connection not established yet</small> |
+ | |||
+ | === Status of connections (iteration 2) === | ||
+ | The current status of participating Member States having established connections is displayed in the tables below: | ||
+ | {| class="wikitable" style="width: 60%;" | ||
|+ | |+ | ||
− | eIDAS Milestone 1 | + | <small><u>eIDAS Milestone 1: Connecting eIDAS proxies and connectors with Fine Grained Powers Validation</u></small> |
! | ! | ||
! colspan="5" |Proxy | ! colspan="5" |Proxy | ||
Line 119: | Line 174: | ||
! | ! | ||
! | ! | ||
+ | ! style="width: 16%" |AT | ||
+ | ! style="width: 16%" |NL | ||
+ | ! style="width: 16%" |RO | ||
+ | ! style="width: 16%" |SE | ||
+ | |- | ||
+ | ! rowspan="4" style="width: 16%" |Connector | ||
!AT | !AT | ||
+ | | style="background-color:lightgrey" | | ||
+ | | style="background-color:grey" | N/A | ||
+ | | style="background-color:grey" | N/A | ||
+ | | style="background-color:grey" | N/A | ||
+ | |- | ||
!NL | !NL | ||
+ | | style="background-color:grey" | N/A | ||
+ | | style="background-color:lightgrey" | | ||
+ | | style="background-color:grey" |N/A | ||
+ | | style="background-color:grey" |N/A | ||
+ | |- | ||
!RO | !RO | ||
+ | | style="background-color:grey" | N/A | ||
+ | | style="background-color:lightgreen" | | ||
+ | | style="background-color:lightgrey" | | ||
+ | | style="background-color:grey" | N/A | ||
+ | |- | ||
!SE | !SE | ||
+ | | style="background-color:grey" | N/A | ||
+ | | style="background-color:lightgreen" | | ||
+ | | style="background-color:lightgreen" | | ||
+ | | style="background-color:lightgrey" | | ||
+ | |} | ||
+ | {| class="wikitable" style="width: 60%;" | ||
+ | |+ | ||
+ | <small><u>OOP TS Milestone 2: MS ready for UC2 with S&N / Lookup pattern</u></small> | ||
+ | ! | ||
+ | ! colspan="5" |MS acting as DP | ||
|- | |- | ||
− | ! rowspan="4" | | + | ! |
+ | ! | ||
+ | ! style="width: 16%" |AT | ||
+ | ! style="width: 16%" |NL | ||
+ | ! style="width: 16%" |RO | ||
+ | ! style="width: 16%" |SE | ||
+ | |- | ||
+ | ! rowspan="4" style="width: 16%" |MS acting as DC | ||
!AT | !AT | ||
− | | | + | | style="background-color:lightgrey" | |
− | | | + | | style="background-color:grey" |N/A |
− | | | + | | style="background-color:lightgreen" | |
− | | | + | | style="background-color:grey" |N/A |
|- | |- | ||
!NL | !NL | ||
− | | | + | | style="background-color:lightgreen" | |
− | | | + | | style="background-color:lightgrey" | |
− | | | + | | style="background-color: lightgreen" | |
− | | | + | | style="background-color:grey" |N/A |
|- | |- | ||
!RO | !RO | ||
− | | | + | | style="background-color:Grey" |N/A |
− | | | + | | style="background-color:grey" |N/A |
− | | | + | | style="background-color:lightgrey" | |
− | | | + | | style="background-color:grey" |N/A |
|- | |- | ||
!SE | !SE | ||
− | | | + | | style="background-color:lightgreen" | |
− | | | + | | style="background-color:grey" |N/A |
− | | | + | | style="background-color: lightgreen" | |
− | | | + | | style="background-color:lightgrey" | |
|} | |} | ||
+ | <small>Green = Connection established</small> | ||
+ | |||
+ | <small>Yellow = Connection partlially established (issues remaining to be solved)</small> | ||
+ | |||
+ | <small>Red = Connection not established yet</small> |
Latest revision as of 08:04, 27 January 2023
Back to Doing Business Abroad main page
[Draft]
This page contains the process, planning and status of establishing connections between participating Member States is presented.
Establishing connections
The DBA pilot is establishing and testing connections between participating Member States, using testcases and connectathons. During specific timeslots, experts of 2 (or more) countries join with technical experts of the DE4A program. The meetings are online, and focus on establishing the connection between DE4A Connectors or eIDAS nodes. Pre-defined testcases are used to collect necessary proof that the connection is functioning correct. Any last-minute errors are being resolved immediately (if possible).
DE4A Connector
Process
For establishing connections between DE4A Conectors of participating Member States the following steps are performed:
- Preparation
- collecting necessary information for configuration of the common components.
- Local testing
- setting up the national DE4A Connector and connecting this to a DE4A Connector in the DE4A playground.
- Connectivity testing
- Connectathon
- testing a full chain of components, using a Mocked DE, one national DE4A Connector (acting as a DT or DR), another national DE4A Connector (acting as a DR or DT) and a Mocked DO (Milestone 2 and 3)
- testing a full chain of components, using a real DE, one national DE4A Connector (acting as a DT or DR), another national DE4A Connector (acting as a DR or DT) and a real DO (Milestone 4)
During the OOP TS connectathons, these test cases and preparations are being used / executed.
Versions of the connector
The DE4A Connector used for piloting will be developed in 2 main versions:
- V1: DE4A Connector supporting the intermediation pattern for piloting UC1
- V2: DE4A Connector supporting the intermediation pattern for UC1 the S&N and Lookup pattern for UC2
Only the V1 connector will be used in the first iteration (as only UC1 will be piloted in the first iteration). For the final iteration, only the V2 connector will be used. File:20210824 Test cases DE4A cross-border AT-NL-RO-SE.xlsx
Status of connections (iteration 1)
The current status of participating Member States having established connections is displayed in the tables below:
Proxy | |||||
---|---|---|---|---|---|
AT | NL | RO | SE | ||
Connector | AT | N/A | N/A | N/A | N/A |
NL | N/A | N/A | |||
RO | N/A | ||||
SE | N/A | N/A | N/A |
DE4A Connector acting as DT | |||||
---|---|---|---|---|---|
AT | NL | RO | SE | ||
DE4A Connector
acting as DR |
AT | N/A | N/A | N/A | |
NL | N/A | ||||
RO | |||||
SE |
MS acting as DP | |||||
---|---|---|---|---|---|
AT | NL | RO | SE | ||
MS
acting as DC |
AT | N/A | N/A | N/A | |
NL | N/A | N/A | |||
RO | N/A | ||||
SE | N/A |
Green = Connection established
Yellow = Connection partlially established (issues remaining to be solved)
Red = Connection not established yet
Status of connections (iteration 2)
The current status of participating Member States having established connections is displayed in the tables below:
Proxy | |||||
---|---|---|---|---|---|
AT | NL | RO | SE | ||
Connector | AT | N/A | N/A | N/A | |
NL | N/A | N/A | N/A | ||
RO | N/A | N/A | |||
SE | N/A |
MS acting as DP | |||||
---|---|---|---|---|---|
AT | NL | RO | SE | ||
MS acting as DC | AT | N/A | N/A | ||
NL | N/A | ||||
RO | N/A | N/A | N/A | ||
SE | N/A |
Green = Connection established
Yellow = Connection partlially established (issues remaining to be solved)
Red = Connection not established yet