Difference between revisions of "Conclusions and major achievements of initial iteration"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
[[DBA D4.7 Initial Running Phase Report|Back to main page of D4.7 Initial Running Phase Report]] | [[DBA D4.7 Initial Running Phase Report|Back to main page of D4.7 Initial Running Phase Report]] | ||
+ | |||
+ | [[Pilot Procedures|Back to previous Chapter: 4. Pilot Procedures]] | ||
''This is a preliminary conclusion. The next deliverable (final report) will provide final conclusions, based on all executed cases with all DE/DO combinations and all patters / power validation methods that have been executed until Q3 2022. But if things are only piloted once, than these are final onclusiions. But in DBA probably limited.'' | ''This is a preliminary conclusion. The next deliverable (final report) will provide final conclusions, based on all executed cases with all DE/DO combinations and all patters / power validation methods that have been executed until Q3 2022. But if things are only piloted once, than these are final onclusiions. But in DBA probably limited.'' |
Revision as of 09:11, 3 November 2021
Back to main page of D4.7 Initial Running Phase Report
Back to previous Chapter: 4. Pilot Procedures
This is a preliminary conclusion. The next deliverable (final report) will provide final conclusions, based on all executed cases with all DE/DO combinations and all patters / power validation methods that have been executed until Q3 2022. But if things are only piloted once, than these are final onclusiions. But in DBA probably limited.