Difference between revisions of "Current status of pilot"
Jump to navigation
Jump to search
Line 9: | Line 9: | ||
''Describe strategies that have been put into place until now, in order to prevent delays.'' | ''Describe strategies that have been put into place until now, in order to prevent delays.'' | ||
− | == 2.3 Achieved interoperability status == | + | *<span style="color:red"> bypass eIDAS authentication and add manual entry for eIDASLegalPersonIdentifier </span> |
+ | *<span style="color:red"> develop components between DT and DO to reduce dependency on DO development resources </span> | ||
+ | *<span style="color:red"> use existing infrastructure (SEMPER NODE) for piloting purposes and to deploy DE4A Connector </span> | ||
+ | *<span style="color:red"> temporarily use dummy IdP (ATLAS) with eIDAS </span> | ||
+ | *<span style="color:red"> use simulated data source and eProcedures </span> | ||
+ | |||
+ | ==2.3 Achieved interoperability status== | ||
''To provide an overview of all possible DE/DO combinations and display the extend to which interoperability is possible'' | ''To provide an overview of all possible DE/DO combinations and display the extend to which interoperability is possible'' | ||
+ | * <span style="color:red"> NL: DO, DT, DR, DE operational; eIDAS operational </span> | ||
+ | * <span style="color:red"> AT: DO, DT, DT operational; DE operational but connected to eIDAS in March 2022; eIDAS operation with version 2.5, profile 1.2 </span> | ||
+ | * <span style="color:red"> RO: DO, DT, DR, DE operational (DE=simulated); eIDAS operational </span> | ||
+ | * <span style="color:red"> SE: DO, DT, DR, DE operational (DE/DO simulated); eIDAS operational per January 2022 </span> | ||
− | == 2.4 Updates in Metrics == | + | ==2.4 Updates in Metrics== |
''To describe (if any) changes in metrics compared to the previous deliverable. Use D4.6 section 2.2 as a basis.'' | ''To describe (if any) changes in metrics compared to the previous deliverable. Use D4.6 section 2.2 as a basis.'' | ||
− | + | *<span style="color:red"> no updates? </span> | |
[[Goals and success criteria|Next chapter: 3. Goals and success criteria]] | [[Goals and success criteria|Next chapter: 3. Goals and success criteria]] |
Revision as of 13:35, 8 November 2021
Back to main page of D4.7 Initial Running Phase Report
Back to previous Chapter: 1. Introduction
2.1 Catalogue of services and status
To include the National side of catalogue of services. Describe per case what was intended and what has actually been achieved.
2.2 Strategy to mitigate infrastructure delays
Describe strategies that have been put into place until now, in order to prevent delays.
- bypass eIDAS authentication and add manual entry for eIDASLegalPersonIdentifier
- develop components between DT and DO to reduce dependency on DO development resources
- use existing infrastructure (SEMPER NODE) for piloting purposes and to deploy DE4A Connector
- temporarily use dummy IdP (ATLAS) with eIDAS
- use simulated data source and eProcedures
2.3 Achieved interoperability status
To provide an overview of all possible DE/DO combinations and display the extend to which interoperability is possible
- NL: DO, DT, DR, DE operational; eIDAS operational
- AT: DO, DT, DT operational; DE operational but connected to eIDAS in March 2022; eIDAS operation with version 2.5, profile 1.2
- RO: DO, DT, DR, DE operational (DE=simulated); eIDAS operational
- SE: DO, DT, DR, DE operational (DE/DO simulated); eIDAS operational per January 2022
2.4 Updates in Metrics
To describe (if any) changes in metrics compared to the previous deliverable. Use D4.6 section 2.2 as a basis.
- no updates?