Difference between revisions of "Second phase"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
+ | This pages serves for preparation of the 2nd phase of the BB assessment. | ||
+ | |||
=== Why === | === Why === | ||
=== Who === | === Who === | ||
− | |||
− | Pilot leaders/architects | + | * WP leaders/task leaders |
+ | * Pilot leaders/architects | ||
+ | * domain experts in the different WPs | ||
− | include WP6? | + | Q include WP6 in assessment? |
=== What === | === What === | ||
− | assess SBBs | + | assess the Solution Building BLocks (SBBs) |
− | also 2nd iteration Pilots? | + | Q include also 2nd iteration Pilots? |
* | * | ||
Line 32: | Line 35: | ||
=== When === | === When === | ||
TODO planning | TODO planning | ||
+ | |||
+ | M33 deadline of Wiki, preferably BB assessment takes place before Holidays | ||
=== Envisaged output === | === Envisaged output === | ||
Line 38: | Line 43: | ||
next steps: | next steps: | ||
− | * KO/inputs | + | * plan KO/inputs |
* | * | ||
[[Category:wip]] | [[Category:wip]] |
Revision as of 12:56, 21 February 2022
This pages serves for preparation of the 2nd phase of the BB assessment.
Why
Who
- WP leaders/task leaders
- Pilot leaders/architects
- domain experts in the different WPs
Q include WP6 in assessment?
What
assess the Solution Building BLocks (SBBs)
Q include also 2nd iteration Pilots?
How
indicators
- interoperability (4 dimensions --> EIF/EIRA)
- maturity (dimensions?)
questionnaire
for WP3,4 and 5
which BB are used by which pilot, by which pattern, new BBs?
which SBB is implementing which ABB (from ref. arch.)?
When
TODO planning
M33 deadline of Wiki, preferably BB assessment takes place before Holidays
Envisaged output
recommendations/lessons learned
next steps:
- plan KO/inputs