Difference between revisions of "Second phase"

From DE4A
Jump to navigation Jump to search
Line 1: Line 1:
 +
This pages serves for preparation of the 2nd phase of the BB assessment.
 +
 
=== Why ===
 
=== Why ===
  
 
=== Who ===
 
=== Who ===
WP leaders/task leaders
 
  
Pilot leaders/architects
+
* WP leaders/task leaders
 +
* Pilot leaders/architects
 +
* domain experts in the different WPs
  
include WP6?
+
Q include WP6 in assessment?
  
 
=== What ===
 
=== What ===
assess SBBs
+
assess the Solution Building BLocks (SBBs)
  
also 2nd iteration Pilots?
+
Q include also 2nd iteration Pilots?
  
 
*  
 
*  
Line 32: Line 35:
 
=== When ===
 
=== When ===
 
TODO planning
 
TODO planning
 +
 +
M33 deadline of Wiki, preferably BB assessment takes place before Holidays
  
 
=== Envisaged output ===
 
=== Envisaged output ===
Line 38: Line 43:
 
next steps:
 
next steps:
  
* KO/inputs
+
* plan KO/inputs
 
*
 
*
  
 
[[Category:wip]]
 
[[Category:wip]]

Revision as of 12:56, 21 February 2022

This pages serves for preparation of the 2nd phase of the BB assessment.

Why

Who

  • WP leaders/task leaders
  • Pilot leaders/architects
  • domain experts in the different WPs

Q include WP6 in assessment?

What

assess the Solution Building BLocks (SBBs)

Q include also 2nd iteration Pilots?

How

indicators

  • interoperability (4 dimensions --> EIF/EIRA)
  • maturity (dimensions?)

questionnaire

for WP3,4 and 5

which BB are used by which pilot, by which pattern, new BBs?

which SBB is implementing which ABB (from ref. arch.)?

When

TODO planning

M33 deadline of Wiki, preferably BB assessment takes place before Holidays

Envisaged output

recommendations/lessons learned

next steps:

  • plan KO/inputs