Difference between revisions of "DBA First iteration running phase"
Jump to navigation
Jump to search
(Created page with "This page addresses general information about the first iteration running phase for the Doing Business Abroad pilot. === Estimated start dates of pilot === {| class="wikitab...") |
|||
Line 1: | Line 1: | ||
+ | === Introduction === | ||
This page addresses general information about the first iteration running phase for the Doing Business Abroad pilot. | This page addresses general information about the first iteration running phase for the Doing Business Abroad pilot. | ||
Line 18: | Line 19: | ||
|RO | |RO | ||
|- | |- | ||
− | |Simulation with real data | + | |Simulation with real data* |
|RO | |RO | ||
|AT | |AT | ||
|- | |- | ||
| rowspan="3" | '''March 2022''' | | rowspan="3" | '''March 2022''' | ||
− | |Real eProcedure with real data | + | |Real eProcedure with real data** |
|AT | |AT | ||
|RO | |RO | ||
|- | |- | ||
− | |Real eProcedure with real data | + | |Real eProcedure with real data** |
|AT | |AT | ||
|NL | |NL | ||
|- | |- | ||
− | |Real eProcedure with real data | + | |Real eProcedure with real data** |
|NL | |NL | ||
|AT | |AT | ||
|- | |- | ||
− | | rowspan="4" | '''TBD''' | + | | rowspan="4" | '''TBD***''' |
|Simulation with real data | |Simulation with real data | ||
|SE | |SE | ||
Line 52: | Line 53: | ||
|AT | |AT | ||
|} | |} | ||
+ | <nowiki>*</nowiki> = Assuming that the Romanian eIDAS pilot node profile 1.1 can communicate with the AT eIDAS pilot node profile 1.2 | ||
+ | |||
+ | <nowiki>**</nowiki> = The AT eProcedure will be connected to the AT eIDAS pilot node in March 2022 | ||
+ | |||
+ | <nowiki>***</nowiki> = FOR Bolagsverket, an eIDAS pilot node solution needs to be established first |
Revision as of 08:29, 8 October 2021
Introduction
This page addresses general information about the first iteration running phase for the Doing Business Abroad pilot.
Estimated start dates of pilot
type | DE | DO | |
november | Real eProcedure with real data | RO | NL |
december | Simulation with real data | NL | RO |
Simulation with real data* | RO | AT | |
March 2022 | Real eProcedure with real data** | AT | RO |
Real eProcedure with real data** | AT | NL | |
Real eProcedure with real data** | NL | AT | |
TBD*** | Simulation with real data | SE | RO |
Simulation with fictitious data | RO | SE | |
Simulation with real data | SE | NL | |
Simulation with real data | SE | AT |
* = Assuming that the Romanian eIDAS pilot node profile 1.1 can communicate with the AT eIDAS pilot node profile 1.2
** = The AT eProcedure will be connected to the AT eIDAS pilot node in March 2022
*** = FOR Bolagsverket, an eIDAS pilot node solution needs to be established first