Difference between revisions of "DBA First iteration running phase"
Jump to navigation
Jump to search
Line 3: | Line 3: | ||
=== Estimated start dates of pilot === | === Estimated start dates of pilot === | ||
− | {| class="wikitable" | + | {| class="wikitable" style="width: 60% |
| | | | ||
|'''type''' | |'''type''' |
Revision as of 08:33, 8 October 2021
Introduction
This page addresses general information about the first iteration running phase for the Doing Business Abroad pilot.
Estimated start dates of pilot
type | DE | DO | |
November 2021 | Real eProcedure with real data | RO | NL |
December 2021 | Simulation with real data | NL | RO |
Simulation with real data1 | RO | AT | |
March 2022 | Real eProcedure with real data2 | AT | RO |
Real eProcedure with real data2 | AT | NL | |
Real eProcedure with real data2 | NL | AT | |
TBD2, 3 | Simulation with real data | SE | RO |
Simulation with fictitious data | RO | SE | |
Simulation with real data | SE | NL | |
Simulation with real data | SE | AT |
- Assuming that the RomanianDutch/Swedish eIDAS pilot node profile 1.1 can communicate with the AT eIDAS pilot node profile 1.2
- The AT eProcedure will be connected to the AT eIDAS pilot node in March 2022
- For Bolagsverket, an eIDAS pilot node solution needs to be established first