Difference between revisions of "DBA Implementation"
Line 3: | Line 3: | ||
[Draft] | [Draft] | ||
− | This page | + | This page contains the process, planning and status of establishing connections between participating Member States is presented. |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
=== Establishing connections === | === Establishing connections === |
Revision as of 10:48, 26 January 2022
Back to Doing Business Abroad main page
[Draft]
This page contains the process, planning and status of establishing connections between participating Member States is presented.
Establishing connections
The DBA pilot is establishing and testing connections between participating Member States, using testcases and connectathons. During specific timeslots, experts of 2 (or more) countries join with technical experts of the DE4A program. The meetings are online, and focus on establishing the connection between DE4A Connectors or eIDAS nodes. Pre-defined testcases are used to collect necessary proof that the connection is functioning correct. Any last-minute errors are being resolved immediately (if possible).
DE4A Connector
Process
For establishing connections between DE4A Conectors of participating Member States the following steps are performed:
- Preparation
- collecting necessary information for configuration of the common components.
- Local testing
- setting up the national DE4A Connector and connecting this to a DE4A Connector in the DE4A playground.
- Connectivity testing
- Connectathon
- testing a full chain of components, using a Mocked DE, one national DE4A Connector (acting as a DT or DR), another national DE4A Connector (acting as a DR or DT) and a Mocked DO (Milestone 2 and 3)
- testing a full chain of components, using a real DE, one national DE4A Connector (acting as a DT or DR), another national DE4A Connector (acting as a DR or DT) and a real DO (Milestone 4)
During the OOP TS connectathons, these test cases and preparations are being used / executed. File:20210824 Test cases DE4A cross-border AT-NL-RO-SE.xlsx
Planning DE4A Connector connectathons
For each milestone, connectathons are scheduled according to the tables below.
DT | |||||
---|---|---|---|---|---|
AT | NL | RO | SE | ||
DR | AT | August 30th / September 3rd | August 30th / September 3rd | August 30th / September 3rd | |
NL | August 30th / September 3rd | June 1st/4th
(completed July 14th/16th) |
August 30th / September 3rd | ||
RO | August 30th / September 3rd | June 1st/4th
(completed July 14th/16th) |
August 30th / September 3rd | ||
SE | August 30th / September 3rd | August 30th / September 3rd | August 30th / September 3rd |
MS acting as DP | |||||
---|---|---|---|---|---|
AT | NL | RO | SE | ||
MS
acting as DC |
AT | tbd | tbd | N/A | |
NL | 29/30 November | 29/30 November | N/A | ||
RO | 29/30 November | 29/30 November | 29/30 November | ||
SE | 29/30 November | 29/30 November | 29/30 November |
eIDAS nodes
Connections between eIDAS nodes are established using existing eIDAS procedures and are scheduled in these timeslots:
Proxy | |||||
---|---|---|---|---|---|
AT | NL | RO | SE | ||
Connector | AT | July 12th/16th | (will be rescheduled) | (will be rescheduled) | |
NL | July 12th/16th | July 5th/9th | (will be rescheduled) | ||
RO | (will be rescheduled) | July 5th/9th | (will be rescheduled) | ||
SE | (will be rescheduled) | (will be rescheduled) | (will be rescheduled) |
Status of connections
The current status of participating Member States having established connections is displayed in the tables below:
Proxy | |||||
---|---|---|---|---|---|
AT | NL | RO | SE | ||
Connector | AT | ||||
NL | |||||
RO | |||||
SE |
DE4A Connector acting as DT | |||||
---|---|---|---|---|---|
AT | NL | RO | SE | ||
DE4A Connector
acting as DR |
AT | ||||
NL | |||||
RO | |||||
SE |
MS acting as DP | |||||
---|---|---|---|---|---|
AT | NL | RO | SE | ||
MS
acting as DC |
AT | N/A | |||
NL | N/A | ||||
RO | |||||
SE |
Green = Connection established
Yellow = Connection partlially established (issues remaining to be solved)
Red = Connection not established yet