Difference between revisions of "Second phase"

From DE4A
Jump to navigation Jump to search
Line 2: Line 2:
  
 
=== Why ===
 
=== Why ===
 +
Learn from DE4A real world experience applying BBs.
  
 
=== Who ===
 
=== Who ===
 
+
People participating in the BB assessment:
 
* WP leaders/task leaders
 
* WP leaders/task leaders
 
* Pilot leaders/architects
 
* Pilot leaders/architects
* domain experts in the different WPs
+
* Domain experts in the different WPs
 
 
Q include WP6 in assessment?
 
  
 
=== What ===
 
=== What ===
assess the Solution Building BLocks (SBBs)
+
Assess the Solution Building Blocks (SBBs) used in DE4A Pilots.
  
 
Q include also 2nd iteration Pilots?
 
Q include also 2nd iteration Pilots?
Line 19: Line 18:
  
 
=== How ===
 
=== How ===
 +
See [https://wiki.de4a.eu/index.php/Building_Blocks BB 1st phase], are we doing this?
 +
 +
Take the list of BBs from the first preliminary assessment.
 +
 +
Add missing BBs, i.e. BBs used by the technical WPs that or not on the list
  
 
==== indicators ====
 
==== indicators ====
  
* interoperability (4 dimensions --> EIF/EIRA)
+
* interoperability (4 dimensions --> EIF/EIRA): assess interoperability of the 4 dimensions
* maturity (dimensions?)
+
*# organizational
 +
*# legal
 +
*# semantic
 +
*# technical
 +
* maturity (dimensions?) from 1st assessment:
 +
 
 +
# Technical
 +
# Administrative
 +
# Operational
 +
 
 +
any changes w.r.t. 1st itewration conclusions?
 +
* openness? CAMMS?
 +
* classification BB?
 +
*# Standards and Specifications
 +
*# Common code or Components
 +
*# Building Blocks
 +
*# Core Service Platforms
 +
*# Generic Services
 +
* degree of meeting pilot's requirements? any gaps?
 +
* easy of implementation/configuration?
 +
* performance of the BB?
 +
* any recommendations?
 +
*
 
*  
 
*  
  
Line 32: Line 58:
  
 
which SBB is implementing which ABB (from ref. arch.)?
 
which SBB is implementing which ABB (from ref. arch.)?
 +
 +
provide answers for the indicators above
  
 
=== When ===
 
=== When ===

Revision as of 15:25, 11 April 2022

This pages serves for preparation of the 2nd phase of the BB assessment.

Why

Learn from DE4A real world experience applying BBs.

Who

People participating in the BB assessment:

  • WP leaders/task leaders
  • Pilot leaders/architects
  • Domain experts in the different WPs

What

Assess the Solution Building Blocks (SBBs) used in DE4A Pilots.

Q include also 2nd iteration Pilots?

How

See BB 1st phase, are we doing this?

Take the list of BBs from the first preliminary assessment.

Add missing BBs, i.e. BBs used by the technical WPs that or not on the list

indicators

  • interoperability (4 dimensions --> EIF/EIRA): assess interoperability of the 4 dimensions
    1. organizational
    2. legal
    3. semantic
    4. technical
  • maturity (dimensions?) from 1st assessment:
  1. Technical
  2. Administrative
  3. Operational

any changes w.r.t. 1st itewration conclusions?

  • openness? CAMMS?
  • classification BB?
    1. Standards and Specifications
    2. Common code or Components
    3. Building Blocks
    4. Core Service Platforms
    5. Generic Services
  • degree of meeting pilot's requirements? any gaps?
  • easy of implementation/configuration?
  • performance of the BB?
  • any recommendations?

questionnaire

for WP3,4 and 5

which BB are used by which pilot, by which pattern, new BBs?

which SBB is implementing which ABB (from ref. arch.)?

provide answers for the indicators above

When

TODO planning

M33 deadline of Wiki, preferably BB assessment takes place before Holidays

Envisaged output

recommendations/lessons learned

next steps:

  • plan KO/inputs