DBA First iteration running phase
Revision as of 08:38, 8 October 2021 by Ard.vanderheijden (talk | contribs)
Introduction
This page addresses general information about the first iteration running phase for the Doing Business Abroad pilot.
Estimated earliest start dates of pilot
type | Data Evaluator | Data Owner | Companies | |
November 2021 | Real eProcedure with real data | RO | NL | Dutch (real) |
December 2021 | Simulation with real data | NL | RO | Romanian (real) |
Simulation with real data1 | RO | AT | Austrian (real) | |
March 2022 | Real eProcedure with real data2 | AT | RO | Romanian (real) |
Real eProcedure with real data2 | AT | NL | Dutch (real) | |
Real eProcedure with real data2 | NL | AT | Austrian (real) | |
TBD2, 3 | Simulation with real data | SE | RO | Romanian (real) |
Simulation with fictitious data | RO | SE | Swedish (fake) | |
Simulation with real data | SE | NL | Dutch (real) | |
Simulation with real data | SE | AT | Austrian (real) |
- Assuming that the RomanianDutch/Swedish eIDAS pilot node profile 1.1 can communicate with the AT eIDAS pilot node profile 1.2
- The AT eProcedure will be connected to the AT eIDAS pilot node in March 2022
- For Bolagsverket, an eIDAS pilot node solution needs to be established first