Second phase
This pages serves for preparation of the 2nd phase of the BB assessment.
Why
Learn from DE4A real world experience applying BBs.
Who
People participating in the BB assessment:
- WP leaders/task leaders
- Pilot leaders/architects
- Domain experts in the different WPs
What
Assess the Solution Building Blocks (SBBs) used in DE4A Pilots.
Also includes 2nd iteration Pilots.
Also include new "BBs" like Connector, mockDE/DO, playground, others TBD?
Take the list of BBs from the first preliminary assessment.
Select only those BBs that where used in DE4A.
Add possible missing BBs, i.e. BBs used by the technical WPs that are not on the list.
How
See BB 1st phase, are we doing this?
For this set of BBs a questionnaire/survey can be completed.
indicators
Possible indicators for the questionnaire:
- interoperability (4 dimensions --> EIF/EIRA): assess interoperability of the 4 dimensions
- organizational
- legal
- semantic
- technical
- maturity on context of DE4A:
- Technical
- Administrative
- Operational
- openness? CAMMS? -> WP6 (WP1/2 can reuse) TODO discuss with Fredrik way forward
- classification BB? Maybe we provide this
- Standards and Specifications
- Common code or Components
- Building Blocks
- Core Service Platforms
- Generic Services
- degree of meeting pilot's requirements? any gaps? Pilot leaders assess level of meeting requirements.
- easy of implementation/configuration? separate section. Practical example of using BBs
- performance of the BB? Fit for purpose?
- any lessons learned?
- enabler for something, e.g. Wallet or SEMPER
- any recommendations?
- bariers for implementation, what nature? technical?
- using the BBs, how much do they contribute/ degree of automation, e.g. USI pattern what types of patterns
- cyber security aspects?
- description of context BBS -> how to define sections -> DoA? general questions, specific process related questions, evaluated related questions
questionnaire
For WP3,4 and 5
Which BB are used by which pilot, by which pattern, new BBs?
Which SBB is implementing which ABB (from ref. arch.)? Harold
Provide answers for the indicators above.
When
TODO planning (April-May):
- draft questionnaire (first half of May)
- KO and discuss with participants (second half of May)
- finalize questionnaire and submit
M33 deadline of Wiki, preferably BB assessment takes place before Holidays
Envisaged output
recommendations/lessons learned
next steps:
- plan KO/inputs