DBA First iteration running phase
Revision as of 08:29, 8 October 2021 by Ard.vanderheijden (talk | contribs)
Introduction
This page addresses general information about the first iteration running phase for the Doing Business Abroad pilot.
Estimated start dates of pilot
type | DE | DO | |
november | Real eProcedure with real data | RO | NL |
december | Simulation with real data | NL | RO |
Simulation with real data* | RO | AT | |
March 2022 | Real eProcedure with real data** | AT | RO |
Real eProcedure with real data** | AT | NL | |
Real eProcedure with real data** | NL | AT | |
TBD*** | Simulation with real data | SE | RO |
Simulation with fictitious data | RO | SE | |
Simulation with real data | SE | NL | |
Simulation with real data | SE | AT |
* = Assuming that the Romanian eIDAS pilot node profile 1.1 can communicate with the AT eIDAS pilot node profile 1.2
** = The AT eProcedure will be connected to the AT eIDAS pilot node in March 2022
*** = FOR Bolagsverket, an eIDAS pilot node solution needs to be established first