DBA First iteration running phase
Revision as of 14:17, 8 December 2021 by Ard.vanderheijden (talk | contribs) (→Estimated earliest start dates of pilot)
Introduction
This page addresses general information about the first iteration running phase for the Doing Business Abroad pilot.
Estimated earliest start dates of pilot
type | Data Evaluator | Data Owner | Companies | |
January 2022 | Simulation with real data | RO | NL | Dutch (real) |
Real eProcedure with real data | NL | RO | Romanian (real) | |
Simulation with real data | SE | RO | Romanian (real) | |
Simulation with real data | SE | NL | Dutch (real) | |
Simulation with real data | SE | AT | Austrian (real) | |
March 2022 | Real eProcedure with real data2 | AT | RO | Romanian (real) |
Real eProcedure with real data2 | AT | NL | Dutch (real) | |
Real eProcedure with real data2 | NL | AT | Austrian (real) | |
TBD2, 3 | Simulation with real data | SE | RO | Romanian (real) |
Simulation with real data1 | RO | AT | Austrian (real) | |
Simulation with fictitious data | RO | SE | Swedish (fake) |
- Assuming that the RomanianDutch/Swedish eIDAS pilot node profile 1.1 can communicate with the AT eIDAS pilot node profile 1.2
- The AT eProcedure will be connected to the AT eIDAS pilot node in March 2022
- For Bolagsverket, an eIDAS pilot node solution needs to be established first
End date of the pilot running phase
The scheduled end date of the first iteration running phase is January 30th 2022.
For several DE/DO combinations in the table above, the estimated start date of the pilot is later than the official end date of the pilot running phase (1st iteration). For those combinations, exceptions will be made for the pilot period.