Difference between revisions of "Conclusions and major achievements of initial iteration"

From DE4A
Jump to navigation Jump to search
Line 1: Line 1:
 
[[DBA D4.7 Initial Running Phase Report|Back to main page of D4.7 Initial Running Phase Report]]
 
[[DBA D4.7 Initial Running Phase Report|Back to main page of D4.7 Initial Running Phase Report]]
 +
 +
[[Pilot Procedures|Back to previous Chapter: 4. Pilot Procedures]]
  
 
''This is a preliminary conclusion. The next deliverable (final report) will provide final conclusions, based on all executed cases with all DE/DO combinations and all patters / power validation methods that have been executed until Q3 2022. But if things are only piloted once, than these are final onclusiions. But in DBA probably limited.''
 
''This is a preliminary conclusion. The next deliverable (final report) will provide final conclusions, based on all executed cases with all DE/DO combinations and all patters / power validation methods that have been executed until Q3 2022. But if things are only piloted once, than these are final onclusiions. But in DBA probably limited.''

Revision as of 10:11, 3 November 2021

Back to main page of D4.7 Initial Running Phase Report

Back to previous Chapter: 4. Pilot Procedures

This is a preliminary conclusion. The next deliverable (final report) will provide final conclusions, based on all executed cases with all DE/DO combinations and all patters / power validation methods that have been executed until Q3 2022. But if things are only piloted once, than these are final onclusiions. But in DBA probably limited.