Conclusions and major achievements of initial iteration

From DE4A
Revision as of 10:11, 3 November 2021 by Ard.vanderheijden (talk | contribs)
Jump to navigation Jump to search

Back to main page of D4.7 Initial Running Phase Report

Back to previous Chapter: 4. Pilot Procedures

This is a preliminary conclusion. The next deliverable (final report) will provide final conclusions, based on all executed cases with all DE/DO combinations and all patters / power validation methods that have been executed until Q3 2022. But if things are only piloted once, than these are final onclusiions. But in DBA probably limited.