Current status of pilot

From DE4A
Jump to navigation Jump to search

Back to main page of D4.7 Initial Running Phase Report

Back to previous Chapter: 1. Introduction

2.1 Catalogue of services and status

To include the National side of catalogue of services. Describe per case what was intended and what has actually been achieved.

2.2 Strategy to mitigate infrastructure delays

Describe strategies that have been put into place until now, in order to prevent delays.

  • bypass eIDAS authentication and add manual entry for eIDASLegalPersonIdentifier
  • develop components between DT and DO to reduce dependency on DO development resources
  • use existing infrastructure (SEMPER NODE) for piloting purposes and to deploy DE4A Connector
  • temporarily use dummy IdP (ATLAS) with eIDAS
  • use simulated data source and eProcedures
  • Establish a demonstration of the DE4A Connector and DE/DO Mocks before starting usage in Member States

2.3 Achieved interoperability status

To provide an overview of all possible DE/DO combinations and display the extend to which interoperability is possible

  • NL: DO, DT, DR, DE operational; eIDAS operational
  • AT: DO, DT, DT operational; DE operational but connected to eIDAS in March 2022; eIDAS operation with version 2.5, profile 1.2
  • RO: DO, DT, DR, DE operational (DE=simulated); eIDAS operational
  • SE: DO, DT, DR, DE operational (DE/DO simulated); eIDAS operational per January 2022

2.4 Updates in Metrics

To describe (if any) changes in metrics compared to the previous deliverable. Use D4.6 section 2.2 as a basis.

  • no updates?


Next chapter: 3. Goals and success criteria