Difference between revisions of "DBA D4.7 Initial Running Phase Report"

From DE4A
Jump to navigation Jump to search
 
(26 intermediate revisions by 2 users not shown)
Line 4: Line 4:
  
 
== Executive Summary ==
 
== Executive Summary ==
''All project deliverables will have an Executive Summary.  ''
+
This document embodies the intermediate report on the DE4A Doing Business Abroad pilot, providing preliminary conclusions and lessons learned from piloting the cross-border exchange of information in the context of the Single Digital Gateway. It is the first of two reports on this matter, covering preparatory activities towards real-life piloting the use cases for Doing Business Abroad. Preparations include the analysis on several topics (like use of eIDAS, company representation and interaction patterns), deployment of DE4A common components, integration into Member State specific solutions, testing of integrations between Member States and common infrastructure components and involving companies to participate in the pilot.  
  
* ''For the Executive Summary, all deliverables should follow these guidlelines:''
+
The main achievements of the Doing Business Abroad pilot are the SDGR-related analyses and the international infrastructure supporting the SDGR-principles.  
* ''Length: please limit the Executive Summary to 1 page (2 pages in exceptional cases).''
 
* ''ALL deliverables must have conclusions at the end of the document.''
 
* ''Goal: The Executive summary is not an “introduction” to the deliverable. The main goal of this section is to provide readers with a whole picture of the document (i.e. the abstract section from the papers), so that they can understand the content of the deliverable at once without further reading.''
 
* ''Self-contained: If there is any input coming from other deliverables, it must be mentioned here.''
 
* ''Motivation for the reader (Recommended: 1 –10  lines):''
 
** ''What is the reason for being for this deliverable? Which challenges it addresses?''
 
** ''What will the reader will learn from it?''
 
* ''Main results and findings (Recommended: 5 to 50 lines):''
 
** ''What are the main results achieved?''
 
** ''How does it contribute in the DE4A context?''
 
* ''Short conclusions (Recommended: 1 to 10 lines):''
 
** ''Key takeaway messages''
 
  
* ''Style: Please use a formal and practical writing style without jargon.''
+
The conducted analyses of challenges the SDGR introduces, such as powers validation, record matching, evidence definition and usability of interaction patterns, are to be considered an important prerequisite for implementing the SDGR. The established international infrastructure confirms the conclusions and choices of these analyses, and facilitates cross-border authentication and authorization of company-representatives, as well as the cross-border exchange of evidence about companies. These infrastructure was developed and extensively tested in a systematic approach, resulting in a proven and secure operation that can be used for actual piloting the first cross-border use case: starting a business in another Member State. The established infrastructure proves a good basis for extension with functionality for the second use case: keeping the company data up to date with the data evaluator and processing of business events. Designs and architectures for the second use case have been completed and impact assessment on national infrastructures have been done as well, providing a good basis for development towards the second part of the pilot.  
  
 +
These results have been achieved despite many challenges, like prioritization and availability of resources due to the pandemic and the ongoing shaping of the SDGR Implementing Act. <These, and other challenges posed risks for DE4A progress and timeline, and unfortunately required several partners to terminate their involvement in the DE4A programme. Five combinations of Data Owners and Data Evaluators have fully completed the development and test cycle and are ready to run real-life pilots. The remaining combinations between other Data Owners and Data Evaluators will be ready later in 2022.
  
'''''Topics to cover'''''
+
Evaluation of all preparatory activities regarding the implementation of the infrastructure to support SDG-use cases for companies, have led to important (preliminary) conclusions and lessons learned. Arguably the most important conclusion would be that the DE4A components used to facilitate the pilot for the SDG-use cases, proved deployable and implementable without any major or unexpected difficulties. Several tests have confirmed that the solution works, and does what it is supposed to do: facilitate the cross-border request and exchange of evidence for business procedures mentioned in the SDG Annex II. Furthermore, a proper and widely available solution for authentication and company representation is found to be an important prerequisite for European implementation of the SDG. With this respect, eIDAS including legal person attributes is already in place today and has proven fit for most of the cases to pilot. Unfortunately, use of eIDAS in real life is limited to natural person authentication only. For implementing the annex II SDG-procedures for businesses, Member States should notify and accept company representation and legal person attributes as well in their production systems.
  
This document embodies the intermediate report on the DE4A Doing Business Abroad pilot, providing preliminary conclusions and lessons learned from piloting cross border information exchange in the context of the Single Digital Gateway. It
+
Doing Business Abroad partners all faced different (local) challenges when implementing the international solution. These challenges were both technical and organizational, and lead to different velocities per Member State when implementing the DE4A solutions. Using a general implementation approach where complexity is introduced very gradually seems paramount. By aiming for a very small and simple start and thereafter stepping towards increasingly complex milestones, partners can organize and focus their implementation-activities and confirm their results with other Member States before commencing a next plateau in the implementation. The approach also helped with the coordination and communication within Member States, as usually several authorities will be involved when implementing the SDG. Installing a project-team on Member State level to coordinate activities from different national authorities is an important successfactor.  Before starting actual implementation, this team should take several months to align resources and priorities within the Member State, and perform preliminary technical/organizational assessments on both the SDG- and the eIDAS-domain.  
  
Major achievements:
+
Additional conclusions and lessons learned are expected from running pilots for both use cases, having real companies and representatives involved.
  
* Developed international infrastructure for cross-border exchange of company evidence by all DBA partners, by deploying and integration DE4A common components to business registers and service providers.
+
==Other Chapters==
* Developed international infrastructure for croon-border authorization and authentication but most DBA Member Status, using eIDAS pilot nodes
 
* Collected proof of proper operation of the cross border infrastructure for authentication, authorization and evidence exchange
 
* Established an internationally supported evidence definition, for exchange of company-information between business registers and service providers.
 
* Established design, architecture and assessment of infrastructure for cross border subscription and notification on company events, to be piloted in 2nd iteration.
 
  
Project status:
+
#[[Introduction]]
 
+
#[[Current status of pilot]]
* facing challenges of pandemic (priorities, resource availability), external events (acute vulnerabilities) and challenges on national level (implementation requires involvement of multiple organizations per Member State, complicating coordination and alignment). Occasionally leading to DBA partners terminating their involvement.
+
#[[Goals and success criteria]]
* 5 DE/DO combinations finishing preparation for piloting by establishing secure communication. Others later in Q1/
+
#[[Pilot Procedures]]
* Established all designs in order to start development of infrastructure for 2nd iteration.
+
#[[Conclusions and major achievements of initial iteration]]
* Pilot runs behind schedule due to reasons mentioned above. Scheduled to start in February 2022.
 
 
 
Main lessons learned until now:
 
 
 
* DE4A common components to support SDG have proven to be deployable and can be integrated to national infrastructures. Alle DBA partners managed to do so.
 
* Member States establish their own maximum velocity for implementing the OOP TS, and velocities differ.
 
* Applying a step-by-step approach for implementing the SDG infrastructure, increasing complexity gradually, has proven to aid with focus and managing the implementation.
 
* Establishing an implementation project on Member State level, involving necessary competent authorities and setting priority over all these authorities, will ease the implementation of the SDG in Member States.
 
* Member States need to establish a notified eID and eIDAS infrastructure before, or at the same time of implementing the SDG infrastructure.
 
 
 
Established infrastructure will be a good basis for future piloting activities (in iteration 2). The infrastructure can be extended with additional patterns and power validation mechanism (meaning there will not be a new infrastructure, but functionality wil be added to the established infrastructure).
 
 
 
== Other Chapters ==
 
 
 
# [[Introduction]]
 
# [[Current status of pilot]]
 
# [[Goals and success criteria]]
 
# [[Pilot Procedures]]
 
# [[Conclusions and major achievements of initial iteration]]
 
  
 
[[References]]
 
[[References]]
  
 
[[Annexes]]
 
[[Annexes]]

Latest revision as of 17:24, 10 February 2022

Back to Doing Business Abroad main page

[Work in progress]

Executive Summary

This document embodies the intermediate report on the DE4A Doing Business Abroad pilot, providing preliminary conclusions and lessons learned from piloting the cross-border exchange of information in the context of the Single Digital Gateway. It is the first of two reports on this matter, covering preparatory activities towards real-life piloting the use cases for Doing Business Abroad. Preparations include the analysis on several topics (like use of eIDAS, company representation and interaction patterns), deployment of DE4A common components, integration into Member State specific solutions, testing of integrations between Member States and common infrastructure components and involving companies to participate in the pilot.

The main achievements of the Doing Business Abroad pilot are the SDGR-related analyses and the international infrastructure supporting the SDGR-principles.

The conducted analyses of challenges the SDGR introduces, such as powers validation, record matching, evidence definition and usability of interaction patterns, are to be considered an important prerequisite for implementing the SDGR. The established international infrastructure confirms the conclusions and choices of these analyses, and facilitates cross-border authentication and authorization of company-representatives, as well as the cross-border exchange of evidence about companies. These infrastructure was developed and extensively tested in a systematic approach, resulting in a proven and secure operation that can be used for actual piloting the first cross-border use case: starting a business in another Member State. The established infrastructure proves a good basis for extension with functionality for the second use case: keeping the company data up to date with the data evaluator and processing of business events. Designs and architectures for the second use case have been completed and impact assessment on national infrastructures have been done as well, providing a good basis for development towards the second part of the pilot.

These results have been achieved despite many challenges, like prioritization and availability of resources due to the pandemic and the ongoing shaping of the SDGR Implementing Act. <These, and other challenges posed risks for DE4A progress and timeline, and unfortunately required several partners to terminate their involvement in the DE4A programme. Five combinations of Data Owners and Data Evaluators have fully completed the development and test cycle and are ready to run real-life pilots. The remaining combinations between other Data Owners and Data Evaluators will be ready later in 2022.

Evaluation of all preparatory activities regarding the implementation of the infrastructure to support SDG-use cases for companies, have led to important (preliminary) conclusions and lessons learned. Arguably the most important conclusion would be that the DE4A components used to facilitate the pilot for the SDG-use cases, proved deployable and implementable without any major or unexpected difficulties. Several tests have confirmed that the solution works, and does what it is supposed to do: facilitate the cross-border request and exchange of evidence for business procedures mentioned in the SDG Annex II. Furthermore, a proper and widely available solution for authentication and company representation is found to be an important prerequisite for European implementation of the SDG. With this respect, eIDAS including legal person attributes is already in place today and has proven fit for most of the cases to pilot. Unfortunately, use of eIDAS in real life is limited to natural person authentication only. For implementing the annex II SDG-procedures for businesses, Member States should notify and accept company representation and legal person attributes as well in their production systems.

Doing Business Abroad partners all faced different (local) challenges when implementing the international solution. These challenges were both technical and organizational, and lead to different velocities per Member State when implementing the DE4A solutions. Using a general implementation approach where complexity is introduced very gradually seems paramount. By aiming for a very small and simple start and thereafter stepping towards increasingly complex milestones, partners can organize and focus their implementation-activities and confirm their results with other Member States before commencing a next plateau in the implementation. The approach also helped with the coordination and communication within Member States, as usually several authorities will be involved when implementing the SDG. Installing a project-team on Member State level to coordinate activities from different national authorities is an important successfactor. Before starting actual implementation, this team should take several months to align resources and priorities within the Member State, and perform preliminary technical/organizational assessments on both the SDG- and the eIDAS-domain.

Additional conclusions and lessons learned are expected from running pilots for both use cases, having real companies and representatives involved.

Other Chapters

  1. Introduction
  2. Current status of pilot
  3. Goals and success criteria
  4. Pilot Procedures
  5. Conclusions and major achievements of initial iteration

References

Annexes