Line 20: Line 20:
 
|NL
 
|NL
 
|Dutch (real)
 
|Dutch (real)
|style="background-color:lightgreen"|Pilot in progress
+
|style="background-color:lightgreen"|Pilot completed
 
|-
 
|-
 
|Real eProcedure with real data
 
|Real eProcedure with real data
Line 26: Line 26:
 
|RO
 
|RO
 
|Romanian (real)
 
|Romanian (real)
|style="background-color:lightgreen"|Pilot in progress
+
|style="background-color:lightgreen"|Pilot completed
 
|-
 
|-
 
|Simulation with real data
 
|Simulation with real data

Revision as of 13:34, 4 July 2022

Back to Doing Business Abroad main page

[Work in progress]

Introduction

This page addresses general information about the first iteration running phase for the Doing Business Abroad pilot.

Estimated earliest start dates of pilot (use case 1)

type Data Evaluator Data Owner Companies Status
May 2022 Simulation with real data RO NL Dutch (real) Pilot completed
Real eProcedure with real data NL RO Romanian (real) Pilot completed
Simulation with real data SE RO Romanian (real) Final configuration in progress
Simulation with real data SE NL Dutch (real) Final configuration in progress
Simulation with real data SE AT 1) 2) Austrian (real) Final configuration in progress
  1. Assuming that the Romanian/Dutch/Swedish eIDAS pilot node profile 1.1 can communicate with the AT eIDAS pilot node profile 1.2
  2. The AT eProcedure will be connected to the AT eIDAS pilot node in July 2022

Legal risks and issues

Should any legal risks / issues apply to one or more of the combinations of DEs and DOs to be piloted, they will be mentioned here.

End date of the pilot running phase

The scheduled end date of the first iteration running phase is May 30th 2022.