DBA First iteration running phase

From DE4A
Jump to navigation Jump to search

Introduction

This page addresses general information about the first iteration running phase for the Doing Business Abroad pilot.

Estimated start dates of pilot

type DE DO
november Real eProcedure with real data RO NL
december Simulation with real data NL RO
Simulation with real data1 RO AT
March 2022 Real eProcedure with real data2 AT RO
Real eProcedure with real data2 AT NL
Real eProcedure with real data2 NL AT
TBD2, 3 Simulation with real data SE RO
Simulation with fictitious data RO SE
Simulation with real data SE NL
Simulation with real data SE AT
  1. Assuming that the RomanianDutch/Swedish eIDAS pilot node profile 1.1 can communicate with the AT eIDAS pilot node profile 1.2
  2. The AT eProcedure will be connected to the AT eIDAS pilot node in March 2022
  3. For Bolagsverket, an eIDAS pilot node solution needs to be established first