Difference between revisions of "DBA Implementation"

From DE4A
Jump to navigation Jump to search
 
(204 intermediate revisions by 2 users not shown)
Line 1: Line 1:
This page will contain lessons learned, tips and tricks on implementing the solution for Doing Business Abroad.
+
[[Doing Business Abroad Pilot|Back to Doing Business Abroad main page]]
  
=== Tips for new Member States implementing and using the DE4A Connector ===
+
[Draft]
  
* Use connectathons as early as possible to share experiences in the setup and resolve issues together.
+
This page contains the process, planning and status of establishing connections between participating Member States is presented.
* Use the publicly available playground and instructions to set up and configure the national DE4A Connector.
 
* Configure the DE4A Connector using a less strict setup for cryptographic validation, to to sort out connectivity issues. Trying to solve issues with strict cryptographic adherence is difficult as the encryption can cause errors, that are not related to the actual functionality and connectivity.
 
  
=== Tips for new Member States implementing and using eIDAS and validating the mandates of representatives ===
+
=== Establishing connections ===
... to be added ...
+
The DBA pilot is establishing and testing connections between participating Member States, using testcases and connectathons. During specific timeslots, experts of 2 (or more) countries join with technical experts of the DE4A program. The meetings are online, and focus on establishing the connection between DE4A Connectors or eIDAS nodes. Pre-defined testcases are used to collect necessary proof that the connection is functioning correct. Any last-minute errors are being resolved immediately (if possible).
  
=== Connectathons ===
+
==== DE4A Connector ====
The DBA pilot is establishing and testing connections between participating Member States, using connectathons. During these timeslots, experts of 2 (or more) countries join with technical experts of the DE4A program. The meetings are online, and focus on establishing the connection between DE4A Connectors oor eIDAS nodes. Pre-defined testcases are used to collect necessary proof that the connection is functioning correct. Any last-minute errors are being resolved immediately (if possible).
 
  
The connectathons for connecting the <u>DE4A Connectors</u> are scheduled in these timeslots:
+
===== Process =====
{| class="wikitable"
+
For establishing connections between DE4A Conectors of participating Member States the following steps are performed:
 +
 
 +
# Preparation
 +
#* collecting necessary information for configuration of the common components.
 +
# Local testing
 +
#* setting up the national DE4A Connector and connecting this to a DE4A Connector in the DE4A playground.
 +
# Connectivity testing
 +
#* testing a full chain of components, using a [[Mock|Mocked DE]], the national DE4A Connector (acting as a DT or DR), the playground DE4A Connector (acting as a DR or DT) and a [[Mock|Mocked DO]].
 +
# Connectathon       
 +
#* testing a full chain of components, using a [[Mock|Mocked DE]], one national DE4A Connector (acting as a DT or DR), another national DE4A Connector (acting as a DR or DT) and a [[Mock|Mocked DO]] (Milestone 2 and 3)
 +
#* testing a full chain of components, using a real DE, one national DE4A Connector (acting as a DT or DR), another national DE4A Connector (acting as a DR or DT) and a real DO (Milestone 4)
 +
 
 +
During the OOP TS connectathons, these test cases and preparations are being used / executed.
 +
 
 +
===== Versions of the connector =====
 +
The DE4A Connector used for piloting will be developed in 2 main versions:
 +
 
 +
* V1: DE4A Connector supporting the intermediation pattern for piloting UC1
 +
* V2: DE4A Connector supporting the intermediation pattern for UC1 the S&N and Lookup pattern for UC2
 +
 
 +
Only the V1 connector will be used in the first iteration (as only UC1 will be piloted in the first iteration). For the final iteration, only the V2 connector will be used. [[File:20210824 Test cases DE4A cross-border AT-NL-RO-SE.xlsx|alt=Testscases and preparations|thumb|Testcases, procedures and preparation for connectathons]]
 +
 
 +
=== Status of connections (iteration 1) ===
 +
 
 +
The current status of participating Member States having established connections is displayed in the tables below:
 +
{| class="wikitable" style="width: 60%;"
 
|+
 
|+
! colspan="2" rowspan="2" |
+
<small><u>eIDAS Milestone 1: Connecting eIDAS proxies and connectors with Full Powers Validation</u></small>
! colspan="4" |DT
+
!
 +
! colspan="5" |Proxy
 +
|-
 +
!
 +
!
 +
!style="width: 16%"|AT
 +
!style="width: 16%"|NL
 +
!style="width: 16%"|RO
 +
!style="width: 16%"|SE
 
|-
 
|-
 +
! rowspan="4" style="width: 16%"|Connector
 
!AT
 
!AT
 +
|style="background-color:grey"|N/A
 +
|style="background-color:grey"|N/A
 +
|style="background-color:grey"|N/A
 +
|style="background-color:grey"|N/A
 +
|-
 +
!NL
 +
|style="background-color:grey"|N/A
 +
|style="background-color:lightgrey"|
 +
|style="background-color:lightgreen"|
 +
|style="background-color:grey"|N/A
 +
|-
 +
!RO
 +
|style="background-color:lightgreen"|
 +
|style="background-color:lightgreen"|
 +
|style="background-color:lightgrey"|
 +
|style="background-color:grey"|N/A
 +
|-
 +
!SE
 +
|style="background-color:grey"|N/A
 +
|style="background-color:grey"|N/A
 +
|style="background-color:grey"|N/A
 +
|style="background-color:lightgrey"|
 +
|}
 +
{| class="wikitable" style="width: 60%;"
 +
|+
 +
<small><u>OOP TS Milestone 2/3: Connecting DE4A Connectors between Member States</u></small>
 +
!
 +
! colspan="5" |DE4A Connector acting as DT
 +
|-
 +
!
 +
!
 +
!style="width: 16%"|AT
 +
!style="width: 16%"|NL
 +
!style="width: 16%"|RO
 +
!style="width: 16%"|SE
 +
|-
 +
! rowspan="4" style="width: 16%"|DE4A Connector
 +
 +
acting
 +
 +
as DR
 +
!AT
 +
|style="background-color:lightgrey"|
 +
|style="background-color:grey"|N/A
 +
|style="background-color:grey"|N/A
 +
|style="background-color:grey"|N/A
 +
|-
 
!NL
 
!NL
 +
|style="background-color:grey"|N/A
 +
|style="background-color:lightgrey"|
 +
|style="background-color:lightgreen"|
 +
|style="background-color:lightgreen"|
 +
|-
 
!RO
 
!RO
 +
|style="background-color:lightgreen"|
 +
|style="background-color:lightgreen"|
 +
|style="background-color:lightgrey"|
 +
|style="background-color:lightgreen"|
 +
|-
 
!SE
 
!SE
 +
|style="background-color:lightgreen"|
 +
|style="background-color:lightgreen"|
 +
|style="background-color:lightgreen"|
 +
|style="background-color:lightgrey"|
 +
|}
 +
 +
{| class="wikitable" style="width: 60%;"
 +
|+
 +
<small><u>OOP TS Milestone 4: Connecting DE4A Connectors, Data Evaluators and Data Owners between Member States</u></small>
 +
!
 +
! colspan="5" |MS acting as DP
 
|-
 
|-
! rowspan="4" |'''DR'''         
+
!
!AT            
+
!
|
+
!style="width: 16%"|AT
|July 5th/9th
+
!style="width: 16%"|NL
|July 5th/9th
+
!style="width: 16%"|RO
|July 5th/9th
+
!style="width: 16%"|SE
(will be rescheduled)
+
|-
 +
! rowspan="4" style="width: 16%"|MS
 +
acting
 +
 
 +
as DC
 +
!AT
 +
|style="background-color:lightgrey"|
 +
|style="background-color:grey"|N/A
 +
|style="background-color:grey"|N/A
 +
|style="background-color:grey"|N/A
 
|-
 
|-
 
!NL
 
!NL
|
+
|style="background-color:grey"|N/A
|
+
|style="background-color:lightgrey"|
|June 1st/4th
+
|style="background-color:lightgreen"|
|June 28th/July 2nd
+
|style="background-color:grey"|N/A
(will be rescheduled)
 
 
|-
 
|-
 
!RO
 
!RO
|July 5th/9th
+
|style="background-color:lightgreen"|
|June 1st/4th           
+
|style="background-color:lightgreen"|
|
+
|style="background-color:lightgrey"|
|June 28th / July 2nd
+
|style="background-color:grey"|N/A
(will be rescheduled)
 
 
|-
 
|-
 
!SE
 
!SE
|JulyNL AT5th/9th
+
|style="background-color:grey"|N/A
(will be resheduled)
+
|style="background-color:lightgreen"|
|June 28th / July 2nd
+
|style="background-color:lightgreen"|
(will be rescheduled)
+
|style="background-color:lightgrey"|
|June 28th / July 2nd   
 
(will be rescheduled)
 
|
 
 
|}
 
|}
The connectathons for connecting <u>eIDAS nodes</u> are scheduled in these timeslots:
+
<small>Green    = Connection established</small>
{| class="wikitable"
+
 
 +
<small>Yellow    = Connection partlially established (issues remaining to be solved)</small>
 +
 
 +
<small>Red        = Connection not established yet</small>
 +
 
 +
=== Status of connections (iteration 2) ===
 +
The current status of participating Member States having established connections is displayed in the tables below:
 +
{| class="wikitable" style="width: 60%;"
 
|+
 
|+
 +
<small><u>eIDAS Milestone 1: Connecting eIDAS proxies and connectors with Fine Grained Powers Validation</u></small>
 
!
 
!
 
! colspan="5" |Proxy
 
! colspan="5" |Proxy
Line 63: Line 174:
 
!
 
!
 
!
 
!
 +
! style="width: 16%" |AT
 +
! style="width: 16%" |NL
 +
! style="width: 16%" |RO
 +
! style="width: 16%" |SE
 +
|-
 +
! rowspan="4" style="width: 16%" |Connector
 
!AT
 
!AT
 +
| style="background-color:lightgrey" |
 +
| style="background-color:grey" | N/A
 +
| style="background-color:grey" | N/A
 +
| style="background-color:grey" | N/A
 +
|-
 
!NL
 
!NL
 +
| style="background-color:grey" | N/A
 +
| style="background-color:lightgrey" |
 +
| style="background-color:grey" |N/A
 +
| style="background-color:grey" |N/A
 +
|-
 
!RO
 
!RO
 +
| style="background-color:grey" | N/A
 +
| style="background-color:lightgreen" |
 +
| style="background-color:lightgrey" |
 +
| style="background-color:grey" | N/A
 +
|-
 
!SE
 
!SE
 +
| style="background-color:grey" | N/A
 +
| style="background-color:lightgreen" |
 +
| style="background-color:lightgreen" |
 +
| style="background-color:lightgrey" |
 +
|}
 +
{| class="wikitable" style="width: 60%;"
 +
|+
 +
<small><u>OOP TS Milestone 2: MS ready for UC2 with S&N / Lookup pattern</u></small>
 +
!
 +
! colspan="5" |MS acting as DP
 +
|-
 +
!
 +
!
 +
! style="width: 16%" |AT
 +
! style="width: 16%" |NL
 +
! style="width: 16%" |RO
 +
! style="width: 16%" |SE
 
|-
 
|-
! rowspan="4" |nnectoro
+
! rowspan="4" style="width: 16%" |MS acting as DC
 
!AT
 
!AT
|
+
| style="background-color:lightgrey" |
|ly 5th / 9thu
+
| style="background-color:grey" |N/A
|ly 12th / 16thu
+
| style="background-color:lightgreen" |
|Will be rescheduled
+
| style="background-color:grey" |N/A
 
|-
 
|-
!L
+
!NL
|ly 5th / 9thu
+
| style="background-color:lightgreen" |
|
+
| style="background-color:lightgrey" |
|y 24th / 28tha
+
| style="background-color: lightgreen" |
|Wil be rescheduled
+
| style="background-color:grey" |N/A
 
|-
 
|-
!O
+
!RO
|ly 12th / 16thu
+
| style="background-color:Grey" |N/A
|y 24th / 28tha
+
| style="background-color:grey" |N/A
|
+
| style="background-color:lightgrey" |
|Will be rescheduled
+
| style="background-color:grey" |N/A
 
|-
 
|-
!E
+
!SE
|Will be rescheduled
+
| style="background-color:lightgreen" |
|Will be rescheduled
+
| style="background-color:grey" |N/A
|Will be rescheduled
+
| style="background-color: lightgreen" |
|
+
| style="background-color:lightgrey" |
 
|}
 
|}
 +
<small>Green    = Connection established</small>
 +
 +
<small>Yellow    = Connection partlially established (issues remaining to be solved)</small>
 +
 +
<small>Red        = Connection not established yet</small>

Latest revision as of 09:04, 27 January 2023

Back to Doing Business Abroad main page

[Draft]

This page contains the process, planning and status of establishing connections between participating Member States is presented.

Establishing connections

The DBA pilot is establishing and testing connections between participating Member States, using testcases and connectathons. During specific timeslots, experts of 2 (or more) countries join with technical experts of the DE4A program. The meetings are online, and focus on establishing the connection between DE4A Connectors or eIDAS nodes. Pre-defined testcases are used to collect necessary proof that the connection is functioning correct. Any last-minute errors are being resolved immediately (if possible).

DE4A Connector

Process

For establishing connections between DE4A Conectors of participating Member States the following steps are performed:

  1. Preparation
    • collecting necessary information for configuration of the common components.
  2. Local testing
    • setting up the national DE4A Connector and connecting this to a DE4A Connector in the DE4A playground.
  3. Connectivity testing
    • testing a full chain of components, using a Mocked DE, the national DE4A Connector (acting as a DT or DR), the playground DE4A Connector (acting as a DR or DT) and a Mocked DO.
  4. Connectathon
    • testing a full chain of components, using a Mocked DE, one national DE4A Connector (acting as a DT or DR), another national DE4A Connector (acting as a DR or DT) and a Mocked DO (Milestone 2 and 3)
    • testing a full chain of components, using a real DE, one national DE4A Connector (acting as a DT or DR), another national DE4A Connector (acting as a DR or DT) and a real DO (Milestone 4)

During the OOP TS connectathons, these test cases and preparations are being used / executed.

Versions of the connector

The DE4A Connector used for piloting will be developed in 2 main versions:

  • V1: DE4A Connector supporting the intermediation pattern for piloting UC1
  • V2: DE4A Connector supporting the intermediation pattern for UC1 the S&N and Lookup pattern for UC2

Only the V1 connector will be used in the first iteration (as only UC1 will be piloted in the first iteration). For the final iteration, only the V2 connector will be used. File:20210824 Test cases DE4A cross-border AT-NL-RO-SE.xlsx

Status of connections (iteration 1)

The current status of participating Member States having established connections is displayed in the tables below:

eIDAS Milestone 1: Connecting eIDAS proxies and connectors with Full Powers Validation
Proxy
AT NL RO SE
Connector AT N/A N/A N/A N/A
NL N/A N/A
RO N/A
SE N/A N/A N/A
OOP TS Milestone 2/3: Connecting DE4A Connectors between Member States
DE4A Connector acting as DT
AT NL RO SE
DE4A Connector

acting

as DR

AT N/A N/A N/A
NL N/A
RO
SE
OOP TS Milestone 4: Connecting DE4A Connectors, Data Evaluators and Data Owners between Member States
MS acting as DP
AT NL RO SE
MS

acting

as DC

AT N/A N/A N/A
NL N/A N/A
RO N/A
SE N/A

Green = Connection established

Yellow = Connection partlially established (issues remaining to be solved)

Red = Connection not established yet

Status of connections (iteration 2)

The current status of participating Member States having established connections is displayed in the tables below:

eIDAS Milestone 1: Connecting eIDAS proxies and connectors with Fine Grained Powers Validation
Proxy
AT NL RO SE
Connector AT N/A N/A N/A
NL N/A N/A N/A
RO N/A N/A
SE N/A
OOP TS Milestone 2: MS ready for UC2 with S&N / Lookup pattern
MS acting as DP
AT NL RO SE
MS acting as DC AT N/A N/A
NL N/A
RO N/A N/A N/A
SE N/A

Green = Connection established

Yellow = Connection partlially established (issues remaining to be solved)

Red = Connection not established yet