SA UC1 Status

From DE4A
Jump to navigation Jump to search

Back to main SA UC1 page

Infrastructure

Connectivity of all three Member States has been successfully validated at the SA connectathons.

DE4A Connector as DT
Portugal Slovenia Spain
DE4A Connector as DR Portugal
Slovenia
Spain

Endpoints

Availability of the endpoints in the first use case is as follows:

Portugal Slovenia Spain
Data Evaluator
Data Owner

The following table shows the status of cross-border interoperability between endpoints from different MS:

Data Owner
Portugal Slovenia Spain
Data Evaluator Portugal
Slovenia
Spain