Difference between revisions of "SA UC1 Status"
Jump to navigation
Jump to search
| Line 1: | Line 1: | ||
| + | ''Back to [[Use_Case_"Application_to_Public_Higher_Education"_(SA_UC1)|main SA UC1 page]]'' | ||
| + | |||
== Infrastructure == | == Infrastructure == | ||
Connectivity of all three Member States has been successfully validated at the SA connectathons. | Connectivity of all three Member States has been successfully validated at the SA connectathons. | ||
Revision as of 15:08, 20 October 2021
Back to main SA UC1 page
Infrastructure
Connectivity of all three Member States has been successfully validated at the SA connectathons.
| DE4A Connector as DT | ||||
|---|---|---|---|---|
| Portugal | Slovenia | Spain | ||
| DE4A Connector as DR | Portugal | October 6 | October 6 | |
| Slovenia | October 6 | September 27 | ||
| Spain | October 6 | September 27 | ||
Endpoints
Availability of the endpoints:
| Portugal | Slovenia | Spain | |
|---|---|---|---|
| Data Evaluator | |||
| Data Owner |
Cross-border testing between end-points:
| Data Owner | ||||
|---|---|---|---|---|
| Portugal | Slovenia | Spain | ||
| Data Evaluator | Portugal | |||
| Slovenia | ||||
| Spain | ||||