Difference between revisions of "SA UC1 Status"
Jump to navigation
Jump to search
| Line 30: | Line 30: | ||
== Endpoints == | == Endpoints == | ||
| − | Availability of the endpoints: | + | Availability of the endpoints in the first use case is as follows: |
{| class="wikitable" | {| class="wikitable" | ||
|+ | |+ | ||
| Line 49: | Line 49: | ||
|} | |} | ||
| − | + | The following table shows the status of cross-border interoperability between endpoints from different MS: | |
{| class="wikitable" | {| class="wikitable" | ||
Revision as of 13:30, 25 January 2022
Back to main SA UC1 page
Infrastructure
Connectivity of all three Member States has been successfully validated at the SA connectathons.
| DE4A Connector as DT | ||||
|---|---|---|---|---|
| Portugal | Slovenia | Spain | ||
| DE4A Connector as DR | Portugal | October 6 | October 6 | |
| Slovenia | October 6 | September 27 | ||
| Spain | October 6 | September 27 | ||
Endpoints
Availability of the endpoints in the first use case is as follows:
| Portugal | Slovenia | Spain | |
|---|---|---|---|
| Data Evaluator | |||
| Data Owner |
The following table shows the status of cross-border interoperability between endpoints from different MS:
| Data Owner | ||||
|---|---|---|---|---|
| Portugal | Slovenia | Spain | ||
| Data Evaluator | Portugal | |||
| Slovenia | ||||
| Spain | ||||