Difference between revisions of "SA UC1 Status"
Jump to navigation
Jump to search
Line 46: | Line 46: | ||
|style="background-color:lightgreen"| | |style="background-color:lightgreen"| | ||
|} | |} | ||
− | |||
− | |||
Cross-border testing between end-points: | Cross-border testing between end-points: |
Revision as of 14:54, 20 October 2021
Infrastructure
Connectivity of all three Member States has been successfully validated at the SA connectathons.
DE4A Connector as DT | ||||
---|---|---|---|---|
Portugal | Slovenia | Spain | ||
DE4A Connector as DR | Portugal | October 6 | October 6 | |
Slovenia | October 6 | September 27 | ||
Spain | October 6 | September 27 |
Endpoints
Availability of the endpoints:
Portugal | Slovenia | Spain | |
---|---|---|---|
Data Evaluator | |||
Data Owner |
Cross-border testing between end-points:
Data Owner | ||||
---|---|---|---|---|
Portugal | Slovenia | Spain | ||
Data Evaluator | Portugal | |||
Slovenia | ||||
Spain |