User contributions
Jump to navigation
Jump to search
- 15:55, 21 November 2022 diff hist +10 DBA Implementation →Status of connections (iteration 1)
- 15:54, 21 November 2022 diff hist +10 DBA Implementation →Status of connections (iteration 1)
- 15:54, 21 November 2022 diff hist -18 DBA Implementation →Status of connections (iteration 1)
- 15:52, 21 November 2022 diff hist -15 DBA Implementation →Status of connections (iteration 1)
- 15:52, 21 November 2022 diff hist +1 DBA Implementation →Status of connections (iteration 1)
- 15:51, 21 November 2022 diff hist -1 DBA Implementation →Status of connections (iteration 1)
- 15:50, 21 November 2022 diff hist +6 Final iteration running phase →End date of the pilot running phase Tag: Visual edit
- 15:48, 21 November 2022 diff hist +24 Final iteration running phase →Estimated earliest start dates of pilot (use case 1 with Full Powers Validation and/or Fine Grained Powers Validation) Tag: Visual edit
- 15:47, 21 November 2022 diff hist -96 Final iteration running phase →Estimated earliest start dates of pilot (use case 2) Tag: Visual edit
- 15:46, 21 November 2022 diff hist -363 Final iteration running phase →Introduction Tag: Visual edit
- 12:28, 15 November 2022 diff hist +83 Final iteration running phase →Measures taken Tag: Visual edit
- 12:23, 15 November 2022 diff hist -8 Final iteration running phase →Estimated earliest start dates of pilot (use case 2)
- 14:54, 2 November 2022 diff hist -2 Final iteration running phase →Estimated earliest start dates of pilot (use case 1 with Full Powers Validation and/or Fine Grained Powers Validation)
- 14:53, 2 November 2022 diff hist -10 Final iteration running phase →Estimated earliest start dates of pilot (use case 1 with Full Powers Validation and/or Fine Grained Powers Validation)
- 10:33, 27 October 2022 diff hist -11 DBA First iteration running phase Tag: Visual edit
- 10:33, 27 October 2022 diff hist -27 DBA First iteration running phase →Estimated earliest start dates of pilot (use case 1)
- 10:27, 27 October 2022 diff hist +2 Final iteration running phase →Estimated earliest start dates of pilot (use case 1 with Full Powers Validation and/or Fine Grained Powers Validation)
- 10:26, 27 October 2022 diff hist +2 Final iteration running phase →Estimated earliest start dates of pilot (use case 1 with Full Powers Validation and/or Fine Grained Powers Validation)
- 15:06, 26 September 2022 diff hist -27 DBA Implementation →Status of connections (iteration 1)
- 15:06, 26 September 2022 diff hist +12 DBA Implementation →Status of connections (iteration 1) Tag: Visual edit
- 14:55, 26 September 2022 diff hist +3 DBA Implementation →Status of connections (iteration 1) Tag: Visual edit
- 14:55, 26 September 2022 diff hist -7 DBA Implementation →Status of connections (iteration 1)
- 14:54, 26 September 2022 diff hist -1 DBA Implementation →Status of connections (iteration 1)
- 14:52, 26 September 2022 diff hist +3 DBA Implementation →Status of connections (iteration 2)
- 14:51, 26 September 2022 diff hist -8 DBA Implementation →Status of connections (iteration 2)
- 14:51, 26 September 2022 diff hist +1 DBA Implementation →Status of connections (iteration 2) Tag: Visual edit
- 14:49, 26 September 2022 diff hist -8 Final iteration running phase →Estimated earliest start dates of pilot (use case 1 with Full Powers Validation and/or Fine Grained Powers Validation)
- 14:49, 26 September 2022 diff hist -12 Final iteration running phase →Estimated earliest start dates of pilot (use case 1 with Full Powers Validation and/or Fine Grained Powers Validation)
- 09:25, 21 September 2022 diff hist +3 DBA Implementation →Status of connections (iteration 2)
- 09:24, 21 September 2022 diff hist +4 DBA Implementation →Status of connections (iteration 2)
- 09:23, 21 September 2022 diff hist -18 DBA Implementation →Status of connections (iteration 2)
- 09:21, 21 September 2022 diff hist +144 Final iteration running phase
- 09:20, 21 September 2022 diff hist +4,863 N Final iteration running phase Created page with "Back to Doing Business Abroad main page [Work in progress] ===Introduction=== This page addresses general information about the first iterati..." Tag: Visual edit
- 09:08, 21 September 2022 diff hist +36 Doing Business Abroad Pilot Tag: Visual edit
- 10:23, 13 September 2022 diff hist -28 DBA First iteration running phase →End date of the pilot running phase Tag: Visual edit
- 10:22, 13 September 2022 diff hist +1 DBA Use case definition →Use cases current Tag: Visual edit
- 12:02, 7 September 2022 diff hist +3 DBA First iteration running phase →Measures taken Tag: Visual edit
- 11:59, 7 September 2022 diff hist +3,132 DBA First iteration running phase →Legal risks and issues
- 11:00, 7 September 2022 diff hist +23 DBA Implementation →Status of connections (iteration 2)
- 11:00, 7 September 2022 diff hist 0 DBA Implementation →Status of connections (iteration 2)
- 10:58, 7 September 2022 diff hist 0 DBA Implementation →Status of connections (iteration 2)
- 10:57, 7 September 2022 diff hist -17 DE4A Member States Infraestructure →MS SMP current Tag: Visual edit
- 08:47, 22 August 2022 diff hist +9 DBA 2nd iteration Solution Architecture →Configuration of harmonised services: SDGR+ becomes SDGRplus current Tag: Visual edit
- 13:38, 4 July 2022 diff hist -5 Useful information on pilots and participants →DE4A pilot participants IT2
- 13:38, 4 July 2022 diff hist -4 Useful information on pilots and participants →DE4A pilot participants IT2
- 13:35, 4 July 2022 diff hist +1 DBA First iteration running phase →End date of the pilot running phase
- 13:34, 4 July 2022 diff hist -4 DBA First iteration running phase →Estimated earliest start dates of pilot (use case 1)
- 13:33, 4 July 2022 diff hist +14 DBA Implementation →Status of connections (iteration 2)
- 13:33, 4 July 2022 diff hist +2 DBA Implementation →Status of connections (iteration 1)
- 13:32, 4 July 2022 diff hist +1 DBA Implementation →Status of connections (iteration 1)
- 10:07, 12 May 2022 diff hist -241 DBA First iteration running phase →End date of the pilot running phase Tag: Visual edit
- 10:07, 12 May 2022 diff hist -4 DBA First iteration running phase →End date of the pilot running phase
- 08:25, 11 May 2022 diff hist -1 DBA First iteration running phase →Estimated earliest start dates of pilot (use case 1)
- 08:24, 11 May 2022 diff hist -11 DBA First iteration running phase →Estimated earliest start dates of pilot (use case 1)
- 08:23, 11 May 2022 diff hist +14 DBA Implementation →Status of connections (iteration 1)
- 08:22, 11 May 2022 diff hist +14 DBA Implementation →Status of connections (iteration 1)
- 08:22, 11 May 2022 diff hist +3 DBA Implementation →Status of connections (iteration 1)
- 08:20, 11 May 2022 diff hist +35 DBA Implementation →Status of connections (iteration 1)
- 14:11, 3 May 2022 diff hist -2 DE4A Member States Infraestructure →MS SMP Tag: Visual edit
- 13:46, 3 May 2022 diff hist +147 DBA First iteration running phase →Introduction Tag: Visual edit
- 12:56, 3 May 2022 diff hist +9 DBA Implementation →Status of connections (iteration 2) Tag: Visual edit
- 14:45, 25 April 2022 diff hist +3 DBA Implementation →Status of connections (iteration 2)
- 14:44, 25 April 2022 diff hist -39 DBA Implementation →Status of connections (iteration 2)
- 14:42, 25 April 2022 diff hist -2 DBA Implementation →Status of connections (iteration 2)
- 14:39, 25 April 2022 diff hist +3 DBA Implementation →Status of connections (iteration 1)
- 14:39, 25 April 2022 diff hist -9 DBA Implementation →Status of connections (iteration 1)
- 14:38, 25 April 2022 diff hist +6 DBA Implementation →Status of connections (iteration 1)
- 14:33, 25 April 2022 diff hist +5 DBA Implementation →Status of connections (iteration 2)
- 14:31, 25 April 2022 diff hist -10 DBA Implementation →Status of connections (iteration 2) Tag: Visual edit: Switched
- 14:27, 25 April 2022 diff hist +203 DBA Implementation →Status of connections (iteration 2) Tag: Visual edit
- 14:26, 25 April 2022 diff hist +58 DBA Implementation →Status of connections (iteration 2) Tag: Visual edit
- 14:24, 25 April 2022 diff hist -178 DBA Implementation →Status of connections (iteration 2)
- 14:22, 25 April 2022 diff hist +3,230 DBA Implementation Tag: Visual edit
- 14:19, 25 April 2022 diff hist -2 DBA Implementation Tag: Visual edit
- 14:18, 25 April 2022 diff hist -2,024 DBA Implementation Tag: Visual edit
- 14:11, 25 April 2022 diff hist +6 DBA Implementation →Status of connections Tag: Visual edit
- 14:09, 25 April 2022 diff hist -639 DBA First iteration running phase →Estimated earliest start dates of pilot Tag: Visual edit
- 10:13, 11 March 2022 diff hist +30 Doing Business Abroad Pilot Tag: Visual edit
- 10:12, 11 March 2022 diff hist +165 Pilots Tag: Visual edit
- 10:11, 11 March 2022 diff hist +91 Doing Business Abroad Pilot Tag: Visual edit
- 10:10, 11 March 2022 diff hist +47 N File:DE4A D4.7 Initial running phase report v0.8 - submitted.pdf D4.7 Initial Running Phase Report current
- 12:40, 1 March 2022 diff hist +11 Doing Business Abroad Pilot Tag: Visual edit
- 10:10, 28 February 2022 diff hist -55 Use Case "Doing Business in Another Member State" (DBA UC2) →Major design decisions current Tag: Visual edit
- 10:08, 28 February 2022 diff hist -1 Use Case "Doing Business in Another Member State" (DBA UC2) Tag: Visual edit
- 10:08, 28 February 2022 diff hist -15 Use Case "Starting a Business in Another Member State" (DBA UC1) current Tag: Visual edit
- 10:08, 28 February 2022 diff hist +13 Use Case "Doing Business in Another Member State" (DBA UC2) Tag: Visual edit
- 10:06, 28 February 2022 diff hist +19 Use Case "Doing Business in Another Member State" (DBA UC2) Tag: Visual edit
- 10:02, 28 February 2022 diff hist -3 Doing Business Abroad Pilot Tag: Visual edit
- 09:58, 28 February 2022 diff hist 0 Pilots →Doing Business Abroad Pilot
- 14:49, 16 February 2022 diff hist -15 DBA First iteration running phase →Estimated earliest start dates of pilot
- 14:49, 16 February 2022 diff hist +286 DBA First iteration running phase →Estimated earliest start dates of pilot
- 14:47, 16 February 2022 diff hist +177 DBA First iteration running phase →Estimated earliest start dates of pilot Tag: Visual edit
- 17:28, 10 February 2022 diff hist -99 Conclusions and major achievements of initial iteration current
- 17:27, 10 February 2022 diff hist -32 Goals and success criteria →3.2.2 Lessons learned from implementing and testing the DE4A OOTS current
- 17:27, 10 February 2022 diff hist -60 Goals and success criteria →3.2.1 Lessons learned from analysing and designing national integration of cross-border OOP
- 17:26, 10 February 2022 diff hist -63 Current status of pilot →2.3 Achieved interoperability status current
- 17:26, 10 February 2022 diff hist -31 Current status of pilot →2.2 Strategy to mitigate infrastructure delays
- 17:25, 10 February 2022 diff hist -97 Current status of pilot →2.2 Strategy to mitigate infrastructure delays
- 17:24, 10 February 2022 diff hist -63 Current status of pilot →2.1.2 Piloting environments
- 17:24, 10 February 2022 diff hist -31 Current status of pilot →2.1 Catalogue of services and status
- 17:24, 10 February 2022 diff hist -32 DBA D4.7 Initial Running Phase Report →Executive Summary current
- 17:24, 10 February 2022 diff hist -33 DBA D4.7 Initial Running Phase Report →Executive Summary
- 17:23, 10 February 2022 diff hist -65 DBA D4.7 Initial Running Phase Report →Executive Summary
- 10:41, 10 February 2022 diff hist -2 Goals and success criteria →3.2 Learning towards Adoption Tag: Visual edit
- 10:40, 10 February 2022 diff hist 0 Goals and success criteria
- 10:35, 10 February 2022 diff hist +1 Goals and success criteria →3.2.1 Lessons learned from analysing and designing national integration of cross-border OOP
- 10:35, 10 February 2022 diff hist +380 Goals and success criteria →3.2 Learning towards Adoption
- 15:00, 9 February 2022 diff hist +1 DBA D4.7 Initial Running Phase Report →Executive Summary
- 15:00, 9 February 2022 diff hist 0 DBA D4.7 Initial Running Phase Report →Executive Summary
- 15:00, 9 February 2022 diff hist +9 DBA D4.7 Initial Running Phase Report →Executive Summary
- 14:59, 9 February 2022 diff hist +66 Conclusions and major achievements of initial iteration
- 14:57, 9 February 2022 diff hist +17 DBA D4.7 Initial Running Phase Report →Executive Summary
- 14:56, 9 February 2022 diff hist +7 Current status of pilot →2.2 Strategy to mitigate infrastructure delays
- 14:53, 9 February 2022 diff hist +1 DBA D4.7 Initial Running Phase Report →Executive Summary
- 14:53, 9 February 2022 diff hist +17 DBA D4.7 Initial Running Phase Report →Executive Summary
- 14:52, 9 February 2022 diff hist -136 DBA D4.7 Initial Running Phase Report
- 14:49, 9 February 2022 diff hist +123 Conclusions and major achievements of initial iteration
- 14:46, 9 February 2022 diff hist +105 Conclusions and major achievements of initial iteration Tag: Visual edit: Switched
- 14:43, 9 February 2022 diff hist 0 Goals and success criteria →3.2.2 Lessons learned from implementing and testing the DE4A OOTS
- 14:42, 9 February 2022 diff hist +108 Goals and success criteria →3.2.2 Lessons learned from implementing and testing the DE4A OOTS
- 14:41, 9 February 2022 diff hist +143 Goals and success criteria →3.1 Introduction Tag: Visual edit
- 14:36, 9 February 2022 diff hist +155 Goals and success criteria →3.2.5 Lessons from interaction with other initiatives Tag: Visual edit
- 13:29, 9 February 2022 diff hist -1 Current status of pilot →2.2 Strategy to mitigate infrastructure delays
- 13:28, 9 February 2022 diff hist 0 Current status of pilot →2.2 Strategy to mitigate infrastructure delays
- 13:28, 9 February 2022 diff hist +23 Current status of pilot →2.2 Strategy to mitigate infrastructure delays
- 13:24, 9 February 2022 diff hist -9 Conclusions and major achievements of initial iteration
- 13:24, 9 February 2022 diff hist -86 Conclusions and major achievements of initial iteration
- 13:21, 9 February 2022 diff hist +33 DBA D4.7 Initial Running Phase Report →Executive Summary
- 13:21, 9 February 2022 diff hist -20 DBA D4.7 Initial Running Phase Report →Executive Summary
- 13:19, 9 February 2022 diff hist +85 DBA D4.7 Initial Running Phase Report →Executive Summary Tag: Visual edit
- 13:11, 9 February 2022 diff hist +94 DBA D4.7 Initial Running Phase Report →Executive Summary
- 09:36, 4 February 2022 diff hist -89 Pilot Procedures →4.3 Planned improvement following received feedback current Tag: Visual edit
- 09:28, 4 February 2022 diff hist -1,593 Pilot Procedures →4.3.2 Pilot procedures improvement Tag: Visual edit
- 15:37, 3 February 2022 diff hist -25 Current status of pilot →2.1.1 Use cases and pilot scenarios Tag: Visual edit
- 15:35, 3 February 2022 diff hist +24 Current status of pilot →2.3 Achieved interoperability status
- 15:33, 3 February 2022 diff hist -144 Current status of pilot →2.2 Strategy to mitigate infrastructure delays
- 15:30, 3 February 2022 diff hist -587 Current status of pilot →2.2 Strategy to mitigate infrastructure delays Tag: Visual edit
- 15:21, 3 February 2022 diff hist +5 Current status of pilot →2.1.2 Piloting environments
- 15:18, 3 February 2022 diff hist -49 Current status of pilot →2.1 Catalogue of services and status
- 15:16, 3 February 2022 diff hist 0 Current status of pilot →2.3 Achieved interoperability status
- 15:15, 3 February 2022 diff hist +32 Current status of pilot →2.3 Achieved interoperability status
- 15:15, 3 February 2022 diff hist +67 Current status of pilot →2.2 Strategy to mitigate infrastructure delays
- 15:14, 3 February 2022 diff hist +65 Current status of pilot →2.1.2 Piloting environments
- 15:12, 3 February 2022 diff hist -1 Current status of pilot Tag: Visual edit
- 15:09, 3 February 2022 diff hist +8 DBA D4.7 Initial Running Phase Report →Executive Summary Tag: Visual edit
- 15:06, 3 February 2022 diff hist -4 DBA D4.7 Initial Running Phase Report →Executive Summary Tag: Visual edit
- 15:04, 3 February 2022 diff hist +26 DBA D4.7 Initial Running Phase Report →Executive Summary
- 15:03, 3 February 2022 diff hist +170 DBA D4.7 Initial Running Phase Report →Executive Summary Tag: Visual edit
- 12:31, 2 February 2022 diff hist +5 Current status of pilot →2.4 Updates in Metrics Tag: Visual edit
- 12:30, 2 February 2022 diff hist 0 Current status of pilot →2.2 Strategy to mitigate infrastructure delays Tag: Visual edit
- 12:28, 2 February 2022 diff hist +19 Conclusions and major achievements of initial iteration Tag: Visual edit
- 12:27, 2 February 2022 diff hist +139 Conclusions and major achievements of initial iteration Tag: Visual edit
- 12:24, 2 February 2022 diff hist +1 DBA D4.7 Initial Running Phase Report Tag: Visual edit
- 12:24, 2 February 2022 diff hist +113 Goals and success criteria →3.2.2 Lessons learned from implementing and testing the DE4A OOTS Tag: Visual edit
- 12:09, 2 February 2022 diff hist -8 Goals and success criteria →3.2 Learning towards Adoption Tag: Visual edit
- 11:57, 2 February 2022 diff hist -20 Goals and success criteria
- 11:57, 2 February 2022 diff hist -2 Goals and success criteria
- 11:56, 2 February 2022 diff hist +2 Goals and success criteria
- 11:56, 2 February 2022 diff hist 0 Goals and success criteria
- 11:56, 2 February 2022 diff hist +20 Goals and success criteria
- 11:55, 2 February 2022 diff hist -1 Goals and success criteria →3.2.5 Lessons from interaction with other initiatives Tag: Visual edit
- 11:53, 2 February 2022 diff hist -2 Conclusions and major achievements of initial iteration Tag: Visual edit
- 11:53, 2 February 2022 diff hist +261 DBA D4.7 Initial Running Phase Report Tag: Visual edit
- 11:44, 2 February 2022 diff hist +34 Current status of pilot Tag: Visual edit
- 11:40, 2 February 2022 diff hist +127 Conclusions and major achievements of initial iteration Tag: Visual edit
- 11:38, 2 February 2022 diff hist 0 Goals and success criteria Tag: Visual edit
- 11:32, 2 February 2022 diff hist 0 Goals and success criteria →3.3 Summary Tag: Visual edit
- 11:30, 2 February 2022 diff hist +4 Conclusions and major achievements of initial iteration Tag: Visual edit
- 11:16, 2 February 2022 diff hist +313 Conclusions and major achievements of initial iteration Tag: Visual edit
- 10:29, 2 February 2022 diff hist -75 Conclusions and major achievements of initial iteration Tag: Visual edit
- 10:03, 2 February 2022 diff hist +1,304 Conclusions and major achievements of initial iteration Tag: Visual edit
- 14:17, 31 January 2022 diff hist +15 DBA D4.7 Initial Running Phase Report →Executive Summary Tag: Visual edit
- 14:16, 31 January 2022 diff hist +217 DBA D4.7 Initial Running Phase Report →Executive Summary Tag: Visual edit
- 14:13, 31 January 2022 diff hist +37 DBA D4.7 Initial Running Phase Report →Executive Summary Tag: Visual edit
- 14:07, 31 January 2022 diff hist +154 DBA D4.7 Initial Running Phase Report →Executive Summary Tag: Visual edit
- 14:06, 31 January 2022 diff hist -1,243 DBA D4.7 Initial Running Phase Report →Executive Summary Tag: Visual edit
- 14:05, 31 January 2022 diff hist +880 DBA D4.7 Initial Running Phase Report →Executive Summary Tag: Visual edit
- 12:42, 31 January 2022 diff hist +185 DBA D4.7 Initial Running Phase Report →Executive Summary Tag: Visual edit
- 09:37, 31 January 2022 diff hist +1 DBA D4.7 Initial Running Phase Report →Executive Summary Tag: Visual edit
- 09:35, 31 January 2022 diff hist -659 Conclusions and major achievements of initial iteration Tag: Visual edit
- 09:34, 31 January 2022 diff hist +2,682 DBA D4.7 Initial Running Phase Report →Executive Summary Tag: Visual edit
- 09:31, 31 January 2022 diff hist +306 Conclusions and major achievements of initial iteration Tag: Visual edit
- 09:29, 31 January 2022 diff hist +2,352 Conclusions and major achievements of initial iteration Tag: Visual edit
- 09:01, 31 January 2022 diff hist +43 Current status of pilot →2.1.1 Use cases and pilot scenarios Tag: Visual edit
- 11:33, 28 January 2022 diff hist +10 Pilot Procedures Tag: Visual edit
- 11:30, 28 January 2022 diff hist 0 Pilot Procedures →4.1.1 General approach
- 11:30, 28 January 2022 diff hist +9 Pilot Procedures →4.1.1 General approach
- 11:29, 28 January 2022 diff hist +2,864 Pilot Procedures →4.3 Planned improvement following received feedback Tag: Visual edit
- 11:02, 28 January 2022 diff hist +1,322 Pilot Procedures →4.3 Planned improvement following received feedback Tag: Visual edit
- 10:44, 28 January 2022 diff hist +2,246 Pilot Procedures →4.2 End users engagement progress and dissemination/impact activities Tag: Visual edit
- 10:25, 28 January 2022 diff hist +1,166 Pilot Procedures →4.2 End users engagement progress and dissemination/impact activities Tag: Visual edit
- 10:15, 28 January 2022 diff hist -2 Pilot Procedures →4.2 End users engagement progress and dissemination/impact activities
- 10:15, 28 January 2022 diff hist 0 Pilot Procedures →4.2 End users engagement progress and dissemination/impact activities
- 10:15, 28 January 2022 diff hist +1 Pilot Procedures →4.2 End users engagement progress and dissemination/impact activities
- 10:14, 28 January 2022 diff hist -1 Pilot Procedures →4.2 End users engagement progress and dissemination/impact activities
- 10:14, 28 January 2022 diff hist +106 Pilot Procedures →4.2 End users engagement progress and dissemination/impact activities Tag: Visual edit
- 10:13, 28 January 2022 diff hist +26 Pilot Procedures →4.2 End users engagement progress and dissemination/impact activities
- 10:13, 28 January 2022 diff hist -64 Pilot Procedures →4.2 End users engagement progress and dissemination/impact activities Tag: Visual edit
- 10:11, 28 January 2022 diff hist 0 Pilot Procedures →4.2 End users engagement progress and dissemination/impact activities
- 10:10, 28 January 2022 diff hist +36 Pilot Procedures →4.2 End users engagement progress and dissemination/impact activities
- 10:09, 28 January 2022 diff hist +19 Pilot Procedures →4.2 End users engagement progress and dissemination/impact activities
- 10:09, 28 January 2022 diff hist +42 Pilot Procedures →4.2 End users engagement progress and dissemination/impact activities Tag: Visual edit
- 10:06, 28 January 2022 diff hist +19 Pilot Procedures →4.2 End users engagement progress and dissemination/impact activities
- 10:05, 28 January 2022 diff hist +72 Pilot Procedures →4.2 End users engagement progress and dissemination/impact activities
- 10:04, 28 January 2022 diff hist -19 Pilot Procedures →4.2 End users engagement progress and dissemination/impact activities
- 10:04, 28 January 2022 diff hist 0 Pilot Procedures →4.2 End users engagement progress and dissemination/impact activities
- 10:03, 28 January 2022 diff hist +1 Pilot Procedures →4.2 End users engagement progress and dissemination/impact activities
- 10:03, 28 January 2022 diff hist +18 Pilot Procedures →4.2 End users engagement progress and dissemination/impact activities
- 10:03, 28 January 2022 diff hist -3 Pilot Procedures →4.2 End users engagement progress and dissemination/impact activities Tag: Visual edit
- 10:02, 28 January 2022 diff hist +140 Pilot Procedures →4.2 End users engagement progress and dissemination/impact activities
- 10:01, 28 January 2022 diff hist +1 Pilot Procedures →4.2 End users engagement progress and dissemination/impact activities Tag: Visual edit
- 10:00, 28 January 2022 diff hist 0 Pilot Procedures →4.2 End users engagement progress and dissemination/impact activities
- 10:00, 28 January 2022 diff hist -1 Pilot Procedures →4.2 End users engagement progress and dissemination/impact activities
- 09:59, 28 January 2022 diff hist -1 Pilot Procedures →4.2 End users engagement progress and dissemination/impact activities Tag: Visual edit
- 09:58, 28 January 2022 diff hist +822 Pilot Procedures →4.2 End users engagement progress and dissemination/impact activities Tag: Visual edit
- 09:58, 28 January 2022 diff hist -836 Pilot Procedures →4.2 End users engagement progress and dissemination/impact activities Tag: Visual edit
- 09:57, 28 January 2022 diff hist -68 Pilot Procedures →4.2 End users engagement progress and dissemination/impact activities
- 09:56, 28 January 2022 diff hist +50 Pilot Procedures →4.2 End users engagement progress and dissemination/impact activities
- 09:56, 28 January 2022 diff hist +17 Pilot Procedures →4.2 End users engagement progress and dissemination/impact activities
- 09:55, 28 January 2022 diff hist +20 Pilot Procedures →4.2 End users engagement progress and dissemination/impact activities
- 09:54, 28 January 2022 diff hist +158 Pilot Procedures →4.2 End users engagement progress and dissemination/impact activities Tag: Visual edit
- 09:52, 28 January 2022 diff hist +1,576 Pilot Procedures →4.1 Cross border pilot testing approach Tag: Visual edit
- 09:51, 28 January 2022 diff hist +862 Pilot Procedures →4.1 Cross border pilot testing approach Tag: Visual edit
- 09:18, 28 January 2022 diff hist +55 Pilot Procedures Tag: Visual edit
- 09:16, 28 January 2022 diff hist +2,747 Pilot Procedures →4.1 Cross borderpilot testing approach Tag: Visual edit
- 08:33, 28 January 2022 diff hist +403 Pilot Procedures Tag: Visual edit
- 16:52, 27 January 2022 diff hist -1,366 Pilot Procedures Tag: Visual edit
- 11:13, 27 January 2022 diff hist -1 Goals and success criteria →3.2.3 Learning towards Adoption Tag: Visual edit
- 10:36, 27 January 2022 diff hist +79 Goals and success criteria →3.2.3 Learning towards Adoption
- 10:35, 27 January 2022 diff hist 0 Goals and success criteria →3.2.3 Learning towards Adoption
- 10:33, 27 January 2022 diff hist -31 Goals and success criteria →3.2.3 Learning towards Adoption
- 10:32, 27 January 2022 diff hist +120 Goals and success criteria →3.2.3 Learning towards Adoption Tag: Visual edit: Switched
- 10:31, 27 January 2022 diff hist +316 Goals and success criteria →3.2.3 Learning towards Adoption
- 10:30, 27 January 2022 diff hist 0 Goals and success criteria →3.2.3 Learning towards Adoption
- 10:30, 27 January 2022 diff hist +79 Goals and success criteria →3.2.3 Learning towards Adoption
- 10:28, 27 January 2022 diff hist +20 Goals and success criteria →3.2.3 Learning towards Adoption
- 11:48, 26 January 2022 diff hist -682 DBA Implementation Tag: Visual edit
- 11:47, 26 January 2022 diff hist +7 DBA 2nd iteration Solution Architecture Tag: Visual edit
- 11:46, 26 January 2022 diff hist -2 File:DBA solution Architecture iteration 1 v0.9.pdf current Tag: Visual edit
- 11:46, 26 January 2022 diff hist +100 DBA 2nd iteration Solution Architecture Tag: Visual edit
- 11:45, 26 January 2022 diff hist +83 File:DBA solution Architecture iteration 1 v0.9.pdf Tag: Visual edit
- 11:45, 26 January 2022 diff hist +121 File:DBA solution Architecture iteration 1 v0.9.pdf Tag: Visual edit
- 11:14, 25 January 2022 diff hist -23 DBA 2nd iteration Solution Architecture →Subscription Tag: Visual edit
- 11:13, 25 January 2022 diff hist +23 DBA 2nd iteration Solution Architecture →Subscription Tag: Visual edit
- 11:12, 25 January 2022 diff hist 0 DBA 2nd iteration Solution Architecture →Subscription Tag: Visual edit
- 11:10, 25 January 2022 diff hist +4 DBA 2nd iteration Solution Architecture →Notification Tag: Visual edit
- 11:09, 25 January 2022 diff hist +57 DBA 2nd iteration Solution Architecture →Subscription Tag: Visual edit
- 11:07, 25 January 2022 diff hist +14 DBA 2nd iteration Solution Architecture →Subscription Tag: Visual edit
- 11:05, 25 January 2022 diff hist +42 DBA 2nd iteration Solution Architecture →DBA pilot iteration 2 Tag: Visual edit
- 09:42, 20 January 2022 diff hist +20 Conclusions and major achievements of initial iteration Tag: Visual edit